background image

OPERATION AND INSTALLATION

Solar Thermal Collector

 

» SOL 29 Premium S

 

» SOL 29 Premium W

Содержание 290016

Страница 1: ...OPERATION AND INSTALLATION Solar Thermal Collector SOL 29 Premium S SOL 29 Premium W...

Страница 2: ...__________________________________________ 3 2 4 Emergency shut down_____________________________________________ 3 2 5 Licenses certi cates________________________________________________ 3 3 Registe...

Страница 3: ...WARNING Scalding Setting the maximum tank temperature higher than 140 F at the control unit is permissible only with a thermostatically controlled DHW mixing valve Other wise there can be a risk of s...

Страница 4: ...installation of solar thermal collectors typically involves installa tion on a roof or otherwise elevated structure Refer to all relevant safety codes to ensure that installation can be completed with...

Страница 5: ...e table below for the rafters that will need to be secured to This is a minimum speci cation It may be possible or necessary to add more mounting racks per array if needed to spread out the roof load...

Страница 6: ...section 6 4 1 on page 5 Uproof 2 1 1 Mounting point spacing between rafters 2 Front and back mounting spacing Repeat the mounting process for all ashing kits in the array Pay attention to vertical var...

Страница 7: ...ear one of the four con nection points This sensor well must be oriented so that a sensor can measure the temperature of the solar uid as it exits the array Do not orient the collector so that the sen...

Страница 8: ...nectors completely into the collector connection Do this for both connector ports on the side where the next collector will be installed Sit the next collector into the frames and slide the inter pane...

Страница 9: ...the hot uid exits the collector array install a threaded connector in the top collector connection and a plug connector in the bottom collector connection WARNING Burns Once the collectors are install...

Страница 10: ...ave been connected it will be necessary to pressure test the system to detect leaks before lling the solar loop with heat transfer uid Propylene glycol solutions can leak from much smaller gaps than c...

Страница 11: ...tions on how to ll ush charge the solar loop consult the pump station manual 8 Maintenance care Specialists should carry out an annual inspection of the solar he ating system to ensure proper function...

Страница 12: ...s Glass thickness 1 8 3 mm Glass transmittance 89 Thermal insulation 2 50 8 mm mineral wool Collector connection 1 BSPP thread ships with adapters Max idle temperature 345 F 174 C Min operating pressu...

Страница 13: ...pylene Glycol 94 Weight performance additives 6 Specific gravity 60 F 15 C 1 053 1 062 pH of Solution 9 5 10 5 Reserve alkalinity 15 0 ml Vapor pressure over operating range 2 2 mmHg Flash point 219 F...

Страница 14: ...Collectors Collectors number type Collector surface area System speci cations System height Pipe run length Ventilation Solar uid type concentration Max ow rate Pump station Pump setting low med high...

Страница 15: ...7 to propylene glycol ph levels above 10 or below 8 8 to periods of stagnation in excess of 60 days 9 to excessive pressure 10 to clouding or similar occurrence resulting from the normal intrusion of...

Страница 16: ...chnological advancement speci cations may change without notice Stand 8643 STIEBEL ELTRON Inc 17 West Street West Hat eld MA Tel 0413 247 3380 Fax 0413 247 3369 info stiebel eltron usa com www stiebel...

Отзывы: