CARB CORK
(OPTIONAL)
STAINLESS STEEL SLEEVE
CARB
CHAMBER
SCREEN
TOOL
MAGNET
AIR INTAKE
SMALL BRICK #1
HEAT INTAKE
MOUTHPIECE
LARGE BRICK
INNER LEDGE
SMALL BRICK #2
O-RINGS
STICKY BRICK
OG BRICK
~1"
INNER FLAME
OUTER FLAME
HEAT
INTAKE
C
D
E
A
B
PREPARE
Insert mouthpiece and heat intake into
•
their appropriate bricks. Place o-rings into
wood before glass for best seal.
Adjust torch so overall flame length is ~1".
•
LOAD
Hold the large brick in one hand and twist
the two smaller bricks to break the magnetic
connection ( A ). Slide the small bricks
away from the stainless steel sleeve and twist
them apart to expose chamber ( B ). Load
ground material loosely into chamber no
higher than the inner ledge so it evenly
covers the screen. Reassemble the Bricks.
OPERATE
Aim torch flame down heat intake, and
•
position flame so the light blue outer flame
is flush with, or just inside, the intake ( C ).
Cover carb and draw slowly until you
•
see/taste/feel vapor. Increase draw
speed.
As you finish the draw, remove torch and
•
open carb.
Stir material between draws as needed.
•
Do not cover air intake on the side of the
•
unit as it provides needed, continuous
airflow. Glass retains heat, so do not touch
heat intake immediately after use.
OPTIONS
The included carb cork ( D ) can be used
•
to block the carb to free up a hand and
produce thicker vapor.
The Hydro Add-On ( E ) is available for
•
purchase at stickybricklabs.com and lets
you add an 18.8mm connection to your
OG Brick.