
2
HEAVY METAL PINBALL MANUAL 500-55S1-01
HEAVY METAL TM & © 2020 UNDER LICENSE TO INCENDIUM LLC
TABLE OF CONTENTS
1. Setup and Moving .................................. 3
1.1 First-Time Setup Instructions ...............................
3
1.2 Adjustments Menu ............................................... 6
1.3 Transporting the Game ........................................
7
1.4 Maintenance ........................................................
8
1.5 Maintenance Kits .................................................
8
1.6 Common Parts .....................................................
8
2. SPIKE System and Node Guide ............ 9
2.1 SPIKE System Overview ......................................
9
2.2 Node Bus Cabling ................................................
9
2.3 System Power ......................................................
9
2.4 SPIKE Node Addresses .......................................
9
2.5 SPIKE Node Programming................................. 10
2.6 SPIKE System Terminology ............................... 10
2.7 Common SPIKE Node Boards ........................... 10
3. Light, Switch, and Driver Reference ... 11
3.1 SPIKE Node Boards ........................................... 11
3.2 Driver Reference ................................................ 12
3.3 Switch Reference ............................................... 14
3.4 Light Reference .................................................. 18
4. Electronic Pinouts and Schematics.... 22
4.1 SPIKE CPU Node 0 ............................................ 22
4.2 Cabinet Node 1 .................................................. 26
4.3 Playfield 48V Driver Pinout Node 8 .................... 27
4.4 Serial LED Board 8a ........................................... 28
4.5 Serial 16 LED Board 8b ...................................... 29
4.6 Trough Serial Opto Receiver Extension 8c ........ 29
4.7 Trough Serial Opto Transmitter .......................... 29
4.8 3 LED Boards ..................................................... 30
4.9 Main Power Supply ............................................ 30
4.10 Power Distribution Board ................................... 31
4.11 Power Plug Wiring.............................................. 31
5. Parts Reference .................................... 32
5.1 Playfield Rubber Parts ....................................... 32
5.2 Rubber Size Chart .............................................. 32
5.3 Playfield Assemblies, Top ..................................
33
5.4 Playfield Assemblies, Bottom ............................ 34
5.5 Backbox Parts.................................................... 35
5.6 Speaker Panel Parts .......................................... 35
5.7 Cabinet Parts ..................................................... 36
5.8 Ball Shooter Assembly .......................................
37
5.9 Auto Launch Assembly ......................................
37
5.10 Ball Trough Assembly.........................................
38
5.11 Slingshot Assembly............................................
38
5.12 Flipper Assembly, Left ........................................
39
5.13 Flipper Assembly, Right .....................................
39
5.14 Pop Bumper Assembly ...................................... 40
5.15 3-Bank Drop Target Assembly ........................... 41
6. Specifications
....................................... 42
6.1 Game Dimensions .............................................. 42
6.2 Warranty ............................................................. 43
6.3 Warnings, Compliance, and Legal Notices ........ 43