2
GUARDIANS OF THE GALAXY LE / PREMIUM MANUAL 500-55L7-01
© MARVEL
MARVEL.COM
TABLE OF CONTENTS
1. Setup and Moving .................................. 3
1.1 First-Time Setup Instructions ...............................
3
1.2 Adjustments Menu ............................................... 6
1.3 Transporting the Game ........................................ 7
1.4 Maintenance ........................................................
8
1.5 Maintenance Kits .................................................
8
1.6 Common Parts .....................................................
8
2. SPIKE System and Node Guide ............ 9
2.1 SPIKE System Overview ......................................
9
2.2 Node Bus Cabling ................................................
9
2.3 System Power ......................................................
9
2.4 SPIKE Node addresses ........................................
9
2.5 SPIKE Node Programming................................. 10
2.6 SPIKE System Terminology ............................... 10
2.7 Common SPIKE Node Boards ........................... 10
3. Light, Switch, and Driver Reference ... 11
3.1 SPIKE Node Boards ........................................... 11
3.2 Driver Reference ................................................ 12
3.3 Switch Reference ............................................... 14
3.4 Light Reference .................................................. 18
3.5 Motor Reference ................................................ 25
4. Electronic Pinouts and Schematics.... 26
4.1 SPIKE-2 CPU Node 0 ........................................ 26
4.2 Cabinet Node 1 ..................................................
28
4.3 Lower Playfield 48V Driver Pinout Node 8 .........
29
4.4 Mid Upper Playfield 48V Driver Pinout Node 9 .. 30
4.5 Through Serial Opto Receiver Extension 8a ...... 31
4.6 Left Lower LED Board 8b................................... 31
4.7 Left Upper LED Board 8c ...................................
32
4.8 Right Upper LED Board 9a ................................
32
4.9 Serial Motor Driver Board 9b .............................
33
4.10 Right Lower LED Board 10a ..............................
33
4.11 Lower LED Board 10b ........................................ 34
4.12 Center Upper LED Board 11a ............................ 34
4.13 SPI core Playfield Node 10 ................................ 35
4.14 Main Power Supply ............................................ 35
4.15 Trough Serial Opto Emitter ................................. 35
4.16 Trough Serial Opto Receiver .............................. 35
4.17 Playfield 48V 4 Coil Pinout Node 11 .................. 36
4.18 Power Distribution Board ................................... 37
4.19 Power Plug Wiring.............................................. 37
5. Parts Reference .................................... 38
5.1 Playfield Rubber Parts .......................................
38
5.2 Rubber Size Chart ..............................................
38
5.3 Playfield Assemblies, Top ..................................
39
5.4 Playfield Assemblies, Bottom ............................ 40
5.5 Backbox Parts.................................................... 41
5.6 Speaker Panel Parts .......................................... 41
5.7 Cabinet Parts ..................................................... 42
5.8 Ball Shooter Assembly ....................................... 43
5.9 Auto Launch Assembly ...................................... 43
5.10 Ball Trough Assembly......................................... 44
5.11 Slingshot Assembly............................................ 44
5.12 Flipper Assembly, Left ........................................ 45
5.13 Flipper Assembly, Right ..................................... 45
5.14 Pop Bumper Assembly ...................................... 46
5.15 1-Bank Drop Target Assembly ........................... 47
5.16 Dual Target Assembly ........................................ 47
5.17 Rocket Raccoon Coil Assembly ........................ 48
5.18 Rocket Raccoon Reference Assembly .............. 48
5.19 Orb Motor Assembly .......................................... 49
5.20 Orb Scissor Assembly........................................ 49
5.21 Orb Arm Guide Assembly .................................. 50
5.22 Kicker Assembly ................................................ 50
5.23 Eject VUK ........................................................... 50
5.24 Left Ramp Assembly .......................................... 51
5.25 Left Ramp Exit Assembly ................................... 51
5.26 Right Ramp Assembly ....................................... 51
5.27 Right Ramp Exit Assembly ................................ 51
5.28 Left Ramp Entrance Assembly .......................... 52
5.29 Right Ramp Entrance Assembly ........................ 52
5.30 Ball Guide #2 & Opto ......................................... 53
5.31 Ball Guide #3 & Opto ......................................... 53
5.32 Ball Guide #7 & Opto ......................................... 53
5.33 Ball Guide #8 & Opto ......................................... 53
5.34 Groot Jaw & Bracket .......................................... 54
5.35 Groot Jaw Motor & Switches ............................. 54
5.36 Groot Jaw Lift..................................................... 54
5.37 4-Ball Trough ...................................................... 55
5.38 Back Panel Assembly ........................................ 55
6. Specifications
....................................... 56
6.1 Game Dimensions .............................................. 56
6.2 Warranty ............................................................. 57
6.3 Warnings, Compliance, and Legal Notices ........ 57