M2B+ Controller
Chapter 4: Basic Operation
4-1 Turning the Power On
When AC power is first applied to the unit, the following sequence of events will occur:
1.
The LCD backlight lights up.
2.
The LCD displays dashes: LEDs have all segments on.
3.
The LCD displays the PROM Rev/Date.
4.
The LCD displays “SelfTest in Progress.”
5.
If the ‘Debug’ parameter is enabled, the following messages about Option Cards can
be displayed:
•
Re-Transmit Detected
•
Cool Analog Detected
•
Heat Analog Detected
•
Serial Comm Detected
•
None Installed
6.
The LED segments turn off.
7.
The LCD backlight turns off.
8.
The LCD displays “Power Available/System OFF.”
At this point, a Manual Vent Operation can be initializeed for 8 seconds by pressing the Vent
button.
The unit is now in a standby mode of operation. No system process control will occur until
the Start button is pressed.
Chapter 4: Basic Operation
21 of 65
Содержание M2B+
Страница 8: ......
Страница 18: ......
Страница 20: ......
Страница 59: ...M2B Controller Chapter 7 Appendix 59 of 65 ...
Страница 60: ...M2B Controller 60 of 65 Chapter 7 Appendix ...
Страница 61: ...M2B Controller Chapter 7 Appendix 61 of 65 ...
Страница 62: ...M2B Controller 62 of 65 Chapter 7 Appendix ...
Страница 63: ...M2B Controller Chapter 7 Appendix 63 of 65 ...
Страница 64: ...M2B Controller 7 2 Control Board Layout 7 3 DAC Board Layout Optional 64 of 65 Chapter 7 Appendix ...