water. The granulator should be installed in an inside covered,
weather-proof environment and away from any areas where water
collects on the floor.
Once the granulator is in position, the front panel must be opened in order to insert the bin as
illustrated
in
Figure 6.
Figure 6: Inserting the Bin
4-3 Electrical
Connection
It is extremely important that the machine is correctly wired into
the plant power source by a licensed electrician. See Section 9 for
a wiring diagram.
All electrical equipment must be properly grounded in accordance
with local and national codes to protect personnel from electrical
shock. A fusible, lockable disconnect between the plant power
source and the machine electrical cabinet is highly recommended.
Page 23 of 54
Содержание BP810
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 7: ......
Страница 18: ......
Страница 20: ......
Страница 40: ......
Страница 44: ......
Страница 45: ...Figure 16 Cutting Chamber Vertical Cross Section DRAWING CA039060S2 Page 45 of 54...
Страница 46: ...Figure 17 Cutting Chamber Longitudal Cross Section DRAWING CA039060S1 Page 46 of 54...
Страница 47: ...Figure 18 Cutting Chamber Front View DRAWING CA039060S3 Page 47 of 54...
Страница 48: ...Figure 19 Cutting Chamber Rear View DRAWING CA039060S4 Page 48 of 54...
Страница 49: ...9 Typical Wiring Diagram Page 49 of 54...
Страница 50: ...DRAWING D05991100000 Page 50 of 54...
Страница 51: ......
Страница 53: ......
Страница 54: ......