4.
Position the Bath
Install the drain and overflow assembly to the bath according to the drain
manufacturer’s instructions.
NOTICE: For baths with apron braces:
Lift the bath at multiple points on its sides
when moving the bath into position. Do not lift the or move the bath by the apron or
apron braces located underneath the bath rim.
NOTICE:
Squeaking may develop if the bath is installed over a subfloor other than
plywood. In order to prevent squeaking, place a pad between the bath and the
subfloor and positioned under the bath supports. We recommend that the pad be
made of spun bonded polypropylene landscape fabric or spun bonded house wrap
material. Do not use roofing felt.
Position the pad under the bath supports.
Position and adjust the bath until its outside edge is flush with the framing.
Verify that the bath is level and well supported by the subfloor.
If the bath is not level, shim using metal, hardwood, or other durable material.
Reposition and shim the bath until it is aligned with the framing and level.
If decreased movement is desired, consider installing an optional mortar cement
bed.
Install a Mortar Cement Bed (Optional)
NOTE:
If a mortar cement bed will be installed, the pad is not required.
Remove the bath and pad from the alcove.
Verify that the bath is level.
Vérifier que la baignoire est nivelée.
Verifique que la bañera esté a nivel.
Shim if necessary.
Caler si nécessaire.
Utilice cuñas si es necesario.
Studs
Montants
Postes de madera
Sterling
15
1064912-2-C