Sterling Power Products 1210CE Скачать руководство пользователя страница 2

these switches divide the battery charger 

   

 INSTALLATION OF 

amp/hr  into the battery bank size ( 

STERLING BATTERY 

domestic bank ) e.g take a 25 amp charger 

CHARGER

on  a 200 amp hr battery bank = a ratio of 
8 : 1 .  if the ratio is between 1-4:1 leave 

Position the charger in a cool dry well 

all switches on and the equalizing  time 

ventilated space, ensuring a reasonable 

will be  approx 1hr, with a ratio of 5-9: 1  

air flow around the charger ( do not 

switch no 1 switch off, and this will 

install in a cupboard or sealed 

increase the equalizing  time to about 

compartment.

2hrs, with a ratio of 10-13: 1  switch nos 1 
and 2 to the off position this will increase 
the time to 3 hours, with a ratio of 14 - 18: 
1  switch 1  2 and 3 to the off position, 
this will increase the equalizing time  to 
about 4 hrs.or set up as per label hints. 

install as close to the batteries as 
possible, preferably within 2 meters of 
the batteries.
Before installing, the charger must be 
set up. beside the output terminals one 

Having set the battery type switch and the 

can see two sets of switches under  the 

equalizing time switches the charger 

terminals, a switch bank of 3 small 

should be installed, and need only be  

switches and a large single switch.

altered in the event of a battery type 

the large switch ( s1 ) changes the 

change or battery bank size change.

equalizing or bulk charge voltage from 
14.4 - 14.8 volts ( 28.8 - 29.6 for 24 

The charger may be mounted in any 

volt units ) the 14.4 volt position must 

position . in the interests of safety connect 

be used if gel or sealed lead acid 

the cables to the charger and run them to 

batteries are used on any bank ( always 

the batteries, the correct cable to use is 

avoid gel or sealed batteries for heavy 

multi strand automotive type cable. each 

cycling ), the 14.8 volt position should 

strand is suitable to carry 1/2  an amp over 

be used for conventional ventilated 

about 2 meters, ie a 30 amp charger would 

lead acid batteries and traction 

require 50 strand copper cable.   

batteries.  if in doubt go for the 14.4 
volt position, 

Connect the cables as per the diagram, 

The switch in the down position 

ensure that all terminals are used, ie in the 

confirmed by the top l.e.d being 

event of only one battery being  charged 

yellow is suitable for standard lead 

then connect the surplus positive output to 

acid or traction  batteries ( 14.8 volts/ 

the other used output, ie both outputs are 

29.6 volts ) not suitable for gel or 

on the same battery.

sealed batteries.
the small set of three switches changes 
the time of the equalizing charge by 
approx  1 hr  per switch, in order to set 

This unit is fitted with an automatic 
110/230 volt crossover as such the 
following voltage may be used ( 80-
130  or  170-280 volts at any 
frequency ( 40-400 hz )

if 

in doubt set to the standard setting as per 
the label covering the output battery 
terminals.

It is extremely important to join any  
output terminal not being used on to one 
which is in use , ie if only 2 outputs are to 
be used then the third must be joined  on 

Содержание 1210CE

Страница 1: ...DVANCED POWER PRODUCTS MARINE AUTOMOTIVE INDUSTRIAL Instructions for the International Range Battery Charger Please read carefully before starting to install it Installationsanleitung ab Seite 8 Vor der Installation sorgfältig durchlesen und Hinweise beachten www sterling power com ...

Страница 2: ...e charger may be mounted in any volt units the 14 4 volt position must position in the interests of safety connect be used if gel or sealed lead acid the cables to the charger and run them to batteries are used on any bank always the batteries the correct cable to use is avoid gel or sealed batteries for heavy multi strand automotive type cable each cycling the 14 8 volt position should strand is ...

Страница 3: ...nths plus 1 x 2 week period in the time will depend on the position of the summer then expect about 3 5 years out timing switches after the equalizing of the average leisure type battery time is complete the charger top led however if you have a crew onboard or will go off leaving only the lower green live onboard expect about 3 5 months l e d this shows the charger is at use out of the same batte...

Страница 4: ...e the better but most people are restrained by cost and size this question i always throw back and ask you how long do you want the electrical system of your boat to be supported after the engine is switched off in most cases the answer is 24 hrs then add up your consumption 30 ft boat fridge 5 amps lights at night averaged out over 24 hrs 5 amp hr total 10 amp hr x 24 hrs 240 amp hr add on 40 an ...

Страница 5: ...boiling it is very important that you stop buying in this case expect to see a battery battery chargers based on amps as this a voltage of 15 volts plus totally irrelevant figure most people What do i look for and how do i stop when they buy a 50 amp charger are my batteries boiling under the illusion that they can then run Boiling a battery is almost inevitable if 50 amps worth of kit from shore ...

Страница 6: ...ed alternator regulators inverters dc dc converters 230 volt alternators and other power equipment Cable required always fit charger as close as possible to the batteries 10a 15a 20a charger for cable runs of 2 m 6mm for cable runs of 5 m 10mm 25a 30a 40a chargers for cable runs of 2 m 16mm for cable runs of 5 m 35mm l 50a charger for cable runs of 2 m 25mm for cable runs of 5 m 35mm Other Sterlin...

Страница 7: ...chutzleiter der 230V Wechselstromversorgung mit der Masse der Gleichspannung verbinden um somit eine Gesamterdung der Gleichstom Masse negativ zu erreichen Die STERLING Lade Netzgeräte haben diese Verbindung nicht Hier können Sie entscheiden ob die Gleichstrommasse negativ mit dem Schutzleiter verbunden sein soll oder nicht DieseVerbindung muß dann extern gelegt werden Grundsätzlich sind die STERL...

Страница 8: ... einfach einstellen Dabei wird zwischen Gel oder versiegelten Batterien und offenen Bleibatterien unterschieden Gel oder versiegelte Batterien werden mit maximal 14 4V 28 8V geladen offene Bleibatterien können bis 14 8V 29 6V oder mehr effektiv geladen werden Die Ausgleichsladungszeit bei dieser Spannung läßt sich durch DIP Schalter sehr einfach einstellen Dieses wird in der folgenden Anleitung be...

Страница 9: ...A Sicherung GFH 168 mit 25A AUE oder AUEL 24V 25A Sicherung GFH 04 01 mit 40A AUE oder AUEL Warum so starke Kabel Dieses Gerät mißt die Spannung an den Ausgängen und hat keinen Spannungsfühler weil es 3 Ausgänge besitzt Deshalb soll ein möglichst kleiner Spannungsabfall zwischen Batterie und Ladegerät sein 1 Ort der Inbetriebnahme Installieren Sie das Lade Netzgerät nur an einem kühlen trockenen u...

Страница 10: ...t kurz ist um einen Leistungsverlust zu vermeiden da das Gerät ansonsten nicht mit Maximalstrom arbeiten kann Die Verbindung kann mit dünnen Kabeln vorgenommen werden da nur Spannungen übertragen werden keine Ströme Achtung Achten Sie unbedingt auf die richtige Polarität Durch Verpolen werden die Dioden zwischen dem positiv Anschlüssen des Lade Netzgerätes zerstört Die Zerstörung der Dioden kann n...

Страница 11: ...iedenen Batteriearten Gel und offene Bleibatterien muß das Lade Netzgerät immer auf den niedrigeren Ladeschlußwert eingestellt werden Der schwarze Schalter muß nach oben 2 Einstellung der richtigen Ausgleichsladungszeit Um die richtige Ausgleichsladungszeit einzustellen müssen Sie Ihre Einsatzart festlegen Circa 4 Stunden Für Traktionsbatterien oder Ladung über einen Generator POSITION 4 Circa 3 S...

Страница 12: ...olen vertauschen von plus und minus an den Batterien erlischt die Garantie ebenfalls Das Lade Netzgerät ist getestet und entspricht den neuesten Emissionsgesetzen und ist CE konform Bei Fragen oder defekten Geräten wenden Sie sich bitte immer direkt an uns Ein schneller Garantieaustausch kann nur hier erfolgen STERLING POWER PRODUCTS GREGORY S MILL ST WORCESTER WR3 8BA ENGLAND Tel 44 1905 731816 F...

Страница 13: ...ON CHARGE AT 14 4 14 8 V STEP 3 CONSTANT VOLTAGE AT 13 5 VOLTS STEP 4 LOW VOLTAGE RESET TO STEP1 STEP 1 CONSTANT CURRENT CHARGE STEP 2 ABSORPTION CHARGE AT 14 4 14 8 V STEP 3 CONSTANT VOLTAGE AT 13 5 VOLTS STEP 4 LOW VOLTAGE RESET TO STEP1 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 ABSORPTION TIME CONTROL APPROX 4 HR IDEAL FOR FULL TRACTION APPLICATIONS AND BOATS WHERE BATTERIES ARE CHARGER FROM GENERATORS M...

Страница 14: ...rdung STERLING CHARGER POWER PACK 3 Outputs Ausgänge _ 110V 230V AC BATTERY1 _ BATTERY2 _ Rec Fuse max Output 10A Empf Sicherung max Leistung 10A L N Earth Erdung STERLING CHARGER POWER PACK 3 Outputs Ausgänge _ 110V 230V AC BATTERY1 _ Rec Fuse max Output 10A Empf Sicherung max Leistung 10A L N Earth Erdung STERLING CHARGER POWER PACK ...

Страница 15: ...messung unabhängig 1 x Amperestundenanzeige Computergesteuerte Datenaufbereitung Der Nebenwiderstand zur Strommessung kann sowohl in die positive als auch in die negative Leitung eingesetzt werden inkl 100A Nebenwiderstand Shunt Hintergrundbeleuchtung zuschaltbar Alle Informationen eines Kanals werden angezeigt Variable Eingangsspannung von 9 30V DC Gerät kann eingebaut als auch als Aufbau montier...

Страница 16: ...dezeiten und damit kürzere Standardregler dient weiterhin als Maschinenlaufzeiten ökologisch Notfall Reger wenn nicht abgebaut sinnvoll Generell keine Nachjustierung nötig Auf positive oder negative Felderregung einfaches Einstellen von Schaltern einstellbar 6 eingebaute Statusanzeigen LEDs Batterietypen Einstellung Ladungsanzeige LEDs AGM GEL SÄURE 3 Stufen Sicherheitssystem mit Automatische Batt...

Отзывы: