
Support:
steppir.com/support
⚫
Tel: 425.453.1910
⚫
Page 22
SECTION 1.2
DIRECTOR EHU DRAWING
The exploded view parts drawing in
Figure 1.20
gives you an overview of the assembly of the director
EHU. Detailed instructions follow.
Key
QTY
Part #
Description
A
10
60
-
0017
#10x
3/4”
Machine screw
B
10
60
-
0018
#10 Flat washer
C
10
60
-
0019
#10 Nylock nut
D
4
60
-
0065
5/16”
x3
-
1/2
”
Hex head bolt
E
4
60
-
0046
5/16”
Nylock nut
F
1
70
-
3420
-
01
Director EHU
G
1
10
-
1502
-
01
Element housing gasket
H
1
10
-
1015
-
11
Element mounting plate
I
4
10
-
1601
-
03
1
-
3/4”
Aluminum saddle half
J
5
60
-
0112
10
-
32 x
1/4”
SS Set Screw
cup point
PREPARING THE BOOM ASSEMBLY
Director EHU
This hardware is in the Element Hardware Kit 72
-
0062
-
01.
The EHU, mounting plate, and gasket are separately packed.
A (x10)
B (x10)
C (x10)
G
H
I
I
I
I
E
E
E
E
F
D
D
D
D
FIG. 1.20
J
J