Installation
29
Step 7: Install tarper tower (If applicable).
a. See NHTSA (National Highway Truck Saftey
Administration) Regulations for accept-
able placement.
b. Modify the truck frame as necessary so
that it ends 2” from the rear of the hooklift.
See brand specific installation instructions.
Step 6: Install bumper.
2.00
a. Before drilling and bolting to the frame, confirm adequate room for cable routing between
in-cab controls and the valve bank. See below and the following page for details.
Note: The top of the reservoir should not be above the truck frame.
NOTE: INSTALL PORT RELIEF 26182 HERE WHEN PN'S
FROM THE FOLLOWING LIST ARE USED.
DUMP ASM'S
61350
42429
59439
LATCH KITS
54216
55758
Step 8: Install hydraulic reservoir and valve bank.
Содержание Slider50
Страница 2: ...Slider50 Hooklift Manual Revisions Date of Revision Description of Revision Section Revised...
Страница 10: ...4 Slider50 Owner s Manual...
Страница 22: ...16 Slider50 Owner s Manual...
Страница 25: ...19 Acceptable Subframe Dimensions for Bodies...
Страница 26: ...20 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 27: ...21 Acceptable Subframe Dimensions for Bodies...
Страница 28: ...22 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 60: ...54 Slider50 Owner s Manual...