
31
Installation
31
Cable Control Installation Continued...
5. Choose a mounting location which is convenient and comfortable for the operator
and provides adequate clearance for the control lever movement. Check the under-
side of the cab for reinforcement members, air lines, wiring harnesses, and linkages
before cutting into the floor. Be sure the location chosen allows the cable to be led
easily away from the control. Reversing control direction usually is not necessary. In
most cases, the direction of the lever movement for a given valve function can be
changed by switching the hydraulic lines at the valve. If this is not an option, control
operation can be changed simply by turning the cable controller 180º.
6. Cut a hole for the control cables to pass through.
7. If using the control mount provided, mark and drill four (4) 3/8” diameter holes for the
3/8” x 1-1/2” cap screws provided.
Cable Connections:
1. Remove the screw from
the cable controller
where the cable end
will install. Do not
remove the other
screws passing through
the cable control hous-
ing.
2. Screw the hex thread-
ed cable end into the
cable controller end.
3. Install the control head
end of the cable into
the cable controller.
Reinstall the cable controller screw passing through the groove in the end of the cable
housing.
4. Check the control for free movement and correct valve control.
5. To connect the cable to the valve handle, start be removing the mounting nut from the
cable assembly. (Large nut in the photo above).
6. Install the threaded portion of the cable assembly through the bulkhead weldment and
replace the mounting nut.
7. Install the clevis provided to the cable
end. The cable end should be parallel
to the bulkhead weldment.
8. Located the clevis on the control valve
handle. If a hole is not provided in the
control valve handle for the clevis, drill a
.375” diameter hole through the valve
handle as illustrated. Install pin and
keeper included with clevis.
9. Do a final check of the controls for free
movement and correct valve control.
Control Cable
Bulkhead Plate
Drill .375 DIA
hole through
handle if
hole is not
present.
Valve
1-1/2”
Содержание SI Cable Host
Страница 2: ...Stellar Cable Hoist Manual Revisions Date of Revision Description of Revision Section Revised...
Страница 6: ...iv Stellar Cable Hoist Owner s Manual...
Страница 10: ...4 Stellar Cable Hoist Owner s Manual...
Страница 18: ...12 Stellar Cable Hoist Owner s Manual...
Страница 26: ...20 Stellar Cable Hoist Owner s Manual...
Страница 50: ...44 Stellar Cable Hoist Owner s Manual Hydraulic Routing Standard Lift Cylinder Standard Cylinder Mount...
Страница 51: ...45 Hydraulics Electrical 45 Hydraulic Routing Telescopic Lift Cylinder Telescopic Cylinder Mount...
Страница 52: ...46 Stellar Cable Hoist Owner s Manual Hydraulic Routing Reverse Mount Lift Cylinder Reverse Cylinder Mount...
Страница 55: ...49 Hydraulics Electrical 49 Hydraulic Routing Reeving Cylinder Reeving Cylinder...
Страница 64: ...58 Stellar Cable Hoist Owner s Manual Chassis Mounted Parts...
Страница 85: ...79 Assembly Drawings 79 19 TYP 2 25 TYP 8 25 TYP 4 19 TYP 2 25 TYP 4 25 TYP 2 Tandem Fenders PN 46122 Continued...