3.1.
Description
SBS-FZ 9000/1.5
1.
Hook for suspension on the support structure
2.
Gear shift switch (raise, lower)
3.
Bowl lifting/lowering
4.
Hook for hanging the load
5.
Load chain
3.2.
Preparation for operation
ASSEMBLY OF THE UNIT
Before attaching the machine to the work area, check that it is not damaged. Make
sure that the support structure on which the machine will be mounted can
withstand the weight of the load and the machine. The support on which the
machine will be mounted must be able to withstand 4 times the rated load. Do not
mount the machine on a support structure that cannot be verified as to its load-
bearing capacity and strength. The responsibility for mounting on a support
structure and for the support structure itself rests with the user. Special care must
be taken when attaching the machine to the supporting structure, and all
conditions for safe operation must be ensured in order to avoid hazards resulting
Содержание SBS-FZ 9000/1.5
Страница 13: ...C 68 D 410 E 150 H mind 780 ...
Страница 14: ...3 8 Explosionszeichnung ...
Страница 26: ...3 8 Assembly drawing ...
Страница 39: ...3 8 Rysunek złożeniowy ...
Страница 51: ...3 8 Výkres sestavy ...
Страница 63: ...C 68 D 410 E 150 H 780 au minimum ...
Страница 64: ...3 8 Dessin d assemblage ...
Страница 76: ...3 8 Esploso ...
Страница 88: ...3 7 Dimensiones del producto Símbolo de la dimensión Dimensión mm A 210 B 340 C 68 D 410 E 150 H 780 mín ...
Страница 89: ...3 8 Dibujo de conjunto ...
Страница 101: ...3 8 Szerelési rajz ...
Страница 113: ...3 8 Samlingstegning ...