Tube insert
o
ff
on
11
STEP 6 – FINAL TUBING CONNECTIONS
1. Connect desired length of tubing from Main water connection to water feed
IN on the Filter housing manifold using the nylon threaded and quick
fi
t
connection
2. Connect the desired length of tubing from the water OUT on the main
fi
lter
housing manifold using the threaded and quick
fi
t connection and connect to
the water IN on the Reverse Osmosis Membrane
fi
lter
3. Connect the desired length of tubing to the OUTLET of the Reverse Osmosis
Membrane to the T connection on the Carbon Post
fi
lter
4. Connect the desired length of tubing from waste reject water outlet to the
Drain Clamp saddle
5. Connect the desired length of tubing from the post Carbon Filter to the
Storage tank
6. Connect the desired length of tubing from the OUTLET of the Post Carbon
Filter to the Faucet
STEP 7 – SYSTEM START UP
1. Check all
fi
ttings are connected and tight
2. Open ball valve from main water connection
3. Open ball valve on storage tank
4. Open faucet until water
fl
ows evenly
5. Check carefully for any drips or leaks
6. Allow system to run a full tank of RO water, approximately 3 hours
If possible, collect water and water the garden
Содержание Reverse Osmosis
Страница 1: ......