13a
Page 12 of 46
25300301 Rev B
®
13.
Starting at the puck well, route both puck cables (13a) through openings
(10a and 10b) into the pan assembly (13b). Connect them to the switcher ports,
labeled Puck 1 and Puck 2 (13c).
14.
Route the cord with circuit breaker plug from the puck well (14a) through
the opening (10a) into the panel (14b). Route the cord down to the floor
passing in front of the horizontal beam and behind the skin, exiting out
under the panel base trim (14c).
11a
12a
12a
13a
14b
VIEW UNDER TABLE
*
*
*
Refer to view under table for
additional routing information.
11.
Route the power cord (11a) from the IEC electrical box located in the
media:scape pan assembly to the puck well through the openings (see steps
10a and 10b ). Connect the C14 end (11b) of the cord to to the C13 pigtail cord
(11c) on the puck well and ensure secure engagement for the connection.
12.
Route the preinstalled Y-cable extension (12a) from the switcher through
the openings (10a and 10b) as shown and connect (12b) to the “wake up
button” cable (12c) from the puck well as shown.
14c
13c
13b
14b
14a
12c
12b
11c
11b
12a