background image

Page 4 of 4

939504755 Rev F

®

MOBILE EASEL

Board Storage Capacity

2 boards can be displayed on sub-board 
while the easel rack can store 10 more.

Mobile Easel Assembly

1.

 Remove easel (A) from box and press casters (B) 

into base (C) (a rubber mallet may be necessary).

NOTE:

 If locking caster option is included, install 

locking casters in the two front positions.

2.

 Remove tray (G) from sub-board (H).

3.

 Angle sub-board (H) to engage upper brackets (D) 

and then rotate until vertical.

4.

 Align sub-board to lower brackets (D) through 

rectangular window in sub-board (J).

5.

 Slide sub-board downward to fully engage to easel.

6.

 Assemble tray (G) with screws.

Large Boards

Can be mounted 
horizontal and vertical.

Step 2

Step 1

Step 3

Step 4

Step 5

Step 6

A

C

B

G

I

H

D

D

H

J

D

G

Содержание Huddleboard

Страница 1: ... by people who want to help you Outside the U S A Canada Mexico Puerto Rico and the U S Virgin Islands call 1 616 247 2500 Or visit our website www steelcase com 2012 Steelcase Inc Grand Rapids MI 49501 U S A Printed in U S A Page 1 of 4 939504755 Rev F MARKERBOARDS Hanger Hooks Ledge Grabbers Flip Chart Pegs Marker Grip PANEL STRUCTURAL TRAY MOBILE EASEL ...

Страница 2: ...e hanger hooks over corner trim NOTE Huddleboard boards are not designed to be ganged together Recommended Markers EXPO dry erase markers from Sanford Maintenance Clean with warm soapy water wipe with sponge and allow to air dry Attaching Ledge Grabbers Slide the ledge grabbers over top of hanger hooks Attaching Flip Chart Pegs 1 Push two pegs over edge of board 2 Position pegs to fit holes in fli...

Страница 3: ...nt brackets at desired height 2 Slide end caps B on both ends of tray C and fasten with screws 3 Position assembled tray C on bracket A and attach with screws NOTE For 72 tray assemblies 4 sets of brackets are required to support tray Detail of locking tab for Avenir and Series 9000 bracket Lock bracket into panel position assembled tray and attach with screws PANEL STRUCTURAL DRYWALL TRAY Avenir ...

Страница 4: ...ng caster option is included install locking casters in the two front positions 2 Remove tray G from sub board H 3 Angle sub board H to engage upper brackets D and then rotate until vertical 4 Align sub board to lower brackets D through rectangular window in sub board J 5 Slide sub board downward to fully engage to easel 6 Assemble tray G with screws Large Boards Can be mounted horizontal and vert...

Отзывы: