background image

42 / 45 

www.stcny.com

13.2A

13.2B

13.2C

13.2D

S49

P30

G06A

S51

S51

S50

2

#S51

2

#S50

2

#S49

S49

Place S49 pin in bottom door hinge 

From the outside of the greenhouse, carefully 

line up hinge on bottom of DOOR 3 with S49 pin on 

door frame. Lower door onto pin until hinges meet. 

Push top door back towards door frame so top hinges line up.

Line up top door hinge with top door 

frame hinge. From bottom of hinges, 

slide S51 pin through both hinges.

Secure pin in place with S50 

lock washer as shown.

QTY

Lock Washer/Pin

QTY

Pin

Repeat steps 13.1A and 13.2D to install hinges 

to doorframe on the back of the greenhouse.

Содержание Easy Grow 6x12 Greenhouse

Страница 1: ...L 7 10 Y e a rs W a rra n t y S T RUCTU R E Easy GrowTM 6 x 12 Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809 New York NY 10123 Customer service 1 877 782 4482...

Страница 2: ...ect a Location 4 Prepare a Foundation 1 Make sure you have all the necessary parts Compare the contents of the three cartons to the List of Parts If any parts are missing or damaged or you have any qu...

Страница 3: ...handling metal parts Do not lean against or push the greenhouse during assembly Take special care not to touch overhead power lines with the Do not attempt to assemble the greenhouse in windy or wet D...

Страница 4: ...shoes gloves and goggles Place all the parts for each step in staging areas checking that you have all parts as you go If any parts are missing or damaged contact STC customer service before beginning...

Страница 5: ...Trim Plate QTY circular vent vent frame plastic nut Bracing Parts QTY Twin Panel QTY Step 2 Step 2 Step 2 Step 11 Step 11 Step 11 Step 11 Step 11 Step 2 Door Handle QTY Steps 2 9 Steps 2 9 Steps 2 Ste...

Страница 6: ...S35 Connector QTY Connector QTY Shelf Trays QTY Anchor Clip and Peg QTY Connector QTY Connector QTY Steps 2 Steps 2 Steps 2 Steps 2 Step 3 Steps 2 3 Step 3 Step 3 Step 8 Step 2 Step 2 Step 2 Steps 3...

Страница 7: ...gles The doors are partially assembled at the factory Remove protective plastic from both sides of panels on DOORS 3 Place sides to face the sun facing down Both doors are identical and partially asse...

Страница 8: ...irpin clip S44 into groove on pin S29 to hold securely in place Hook one side of spring S33 into hole on handle S30 Repeat steps 1 2 through 1 3C to complete second door Open door handle kit and remov...

Страница 9: ...INSIDE Lay out all the parts for the front face in a staging area Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installa...

Страница 10: ...lide profiles G06C into G06A and G06B using connectors P28 NOTE P28 connectors do not snap into place Secure each connector with two S52 screws Repeat step 2 2A through 2 2C to duplicate one more set...

Страница 11: ...bottom when standing Slide profiles G02E and G02F into connectors P09 P12 and P10 until they click into place x2 NOTE ALL VIEWS ARE FROM INSIDE Remove protective plastic from both sides of panels Y5...

Страница 12: ...3 Y5 Place connectors S17L and S17R on frame lining up holes as shown Secure with two S02 screws and G02B Continue sliding together making sure G02E Connectors click NOTE ALL VIEWS ARE FROM INSIDE QTY...

Страница 13: ...d one Y32 panel into V channels on profiles G02A G02B G06A and G06B of the greenhouse FRONT Fit top edges into profiles G17A and G17B Remove protective plastic from both sides of panels Y31 and Y32 Pl...

Страница 14: ...01N G01M 4 x2 into place NOTE ALL VIEWS ARE FROM INSIDE QTY QTY Connector Connector Connectors P04 and P05 CLICK into place Connectors P01 and P03 look very similar P01 has built in nuts used to suppo...

Страница 15: ...steps 2 8A through 2 9 to fit the bottom profiles to the back of the greenhouse x2 way into place carefully line up P01 connectors with G06B and G06A and P04 and P05 connectors with into V channels Sn...

Страница 16: ...ables to the back of the greenhouse x2 facing up Slide connector to other side of channel Use hex key to securely tighten and hold in place Use hex key to securely tighten and hold in place connector...

Страница 17: ...the parts for the sides on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety...

Страница 18: ...epeat to make four sets Slide connector P03 into Connector Connector P39 CLICKS into place Connector P03 CLICKS into place QTY Att into the Secure with two S02 screws Repeat to make four sets IMPORTAN...

Страница 19: ...G04D G03V G04C G04B P39 P39 S02 Secure with S02 screw Repeat to make four sets connector S01 into channel of G04C Slide long side of connectors S20 QTY Screw Connector P39 CLICKS into place Secure wit...

Страница 20: ...4 4 S02 S20 4 G03B G03B G07C G03V G07C G01D G03B G03V G07C G01D S02 G07C G01D G03B G03V lining up holes as shown Secure with three S02 screws Repeat to make four sets Secure with six S02 screws Repeat...

Страница 21: ...G07D G03V G07D G07D G01D G03B G03V G07D G01D G03B G03V G01D S02 G03T P19 G03T P19 G03T P01 P01 Secure with six S02 screws Repeat to make two sets QTY Screw QTY QTY make two sets NOTE ALL VIEWS ARE FR...

Страница 22: ...9 G01D G14J 4 Carefully slide sections together as shown We recommend using two people for this step Repeat to make two sets NOTE The two sides are identical When you connect them to the back there wi...

Страница 23: ...QTY Connector QTY Place all the parts for the shelves on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy in...

Страница 24: ...onnectors S37 rest on top of profile G17C Push side in until connectors click into place G17C with two S02 screws With the outside facing a wall carefully stand back up and lean against the wall Stand...

Страница 25: ...7C G07D P03 P39 G17D S37 S37 S37 P10 G07D connector P03 until it clicks into place Slide clicks into place G17D Push side in until connectors click into place Connector P05 CLICKS into place Connector...

Страница 26: ...03 P03 P03 G14C G14D G14C right side until it clicks into place Connect Sides to Front Keep the structure as is with the back against the wall until you Connectors P03 CLICK into place Connectors P03...

Страница 27: ...6 2B G17B S37 G01D P04 G07C P09 G07D G07C G01D G01D P04 P09 P10 P05 G07C P05 G07C G01D P09 S37 G01D P04 G14C G07D P10 G14D S37 click into place Connectors P09 and P10 CLICK into place Connectors P04...

Страница 28: ...A G14C G14D P39 S37 S37 G17A G17B G14C G14D P39 into connector P39 Repeat step 6 3A sliding shelf profile G14D into P39 connector Make sure connector S37 rests on top of profile G17B with four S02 scr...

Страница 29: ...ith the outside facing the ground ALL VIEWS ARE SHOWN FROM INSIDE IMPORTANT This greenhouse is equipped with one MANUAL vent handle S25 installed in step 7 1B and one AUTOMATIC vent handle auto vent o...

Страница 30: ...and G03Y Attach shorter side 26 5 to connector S22 QTY QTY Connector QTY IMPORTANT u shaped cutout is not at midpoint of profiles G03G and G03H Attach shorter side 26 5 to connector P21 Make sure con...

Страница 31: ...use two people to carefully lower front and back gables onto frame Line up and slide connectors S20 into channels of profiles G03E G03J G03Y and G03Z IMPORTANT U shaped cutouts on profiles G03Y and G...

Страница 32: ...rom the outside IMPORTANT Have the roof vents nearby You will install the roof vent BEFORE connecting both sides It is best to use two people for this step of G02N next to center connector P21 Screw S...

Страница 33: ...3Y and G03J with two S02 screws G02G with one S02 screw VIEWS FROM INSIDE VIEWS FROM INSIDE From inside of greenhouse line up bracing profile bar S23 with holes in profiles G03T Secure one S02 screw p...

Страница 34: ...notches and tighten securely IMPORTANT Make sure the pins face UP on INSIDE NOTE G05D has two hairpin clips used to secure the handle of the vent to prevent it from moving in high winds See Step 8 11C...

Страница 35: ...NOTE ALL VIEWS ARE FROM INSIDE VIEWS FROM INSIDE Line up G05G channel with U shaped cutouts in profiles G03H and G03J With bolts on the inside of the greenhouse slide one end of profile G05G into V c...

Страница 36: ...connector and hold in place Attach one side of long cable S07 to hook and cable to a second S06 cable connector With hook facing the back insert connector into Push towards center until is tight Use h...

Страница 37: ...06 cable connector With hook facing the Push towards center Repeat step 9 3 inserting cable connectors S06 and cable is tight Use hex key to securely tighten second connector to hold in place square a...

Страница 38: ...me pins with holes in panel Y32 and slide into place From the inside of the greenhouse slide circular vent under the cable Line up pins in vent frame with holes in circular vent and slide into place I...

Страница 39: ...move protective plastic from both sides of panels Y11 Y12 and Y13 Place side to face toward the sun facing out when installing Slide panels carefully into V channels in gable profiles G03E G03H G03G G...

Страница 40: ...bly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Remove the six hex nuts from the hex bolts attached to each G09C and G09D trim plate BEFORE installin...

Страница 41: ...place On top of the greenhouse push trim plate J06 onto connector P21 and slide towards the back until it snaps into place In the back of the greenhouse slide plastic trim plates J02L J02R and J03 in...

Страница 42: ...rs The door has been assembled in Step 1 When hung the bracing bar is on the inside of the greenhouse We recommend using two people to hang the door Install hinges to door frame Line up door hinge P30...

Страница 43: ...R 3 with S49 pin on door frame Lower door onto pin until hinges meet Push top door back towards door frame so top hinges line up Line up top door hinge with top door frame hinge From bottom of hinges...

Страница 44: ...ish proper the concrete is partially dry use a hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours QTY Anchor Peg QTY Anchor Clip Make sure the foundati...

Страница 45: ...ys interlock together and rest on the QTY Trays Place all the parts for the trays and bin holder on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow...

Страница 46: ...Notes...

Страница 47: ...www ecomposter net for composting solutions Ecomposter Sphere Standard Base and Optional Base Service client le 1 877 782 4482 Email easygrow stcaustin com Please keep this manual in a safe place for...

Отзывы: