STAUFF STA-CK-305 Скачать руководство пользователя страница 6

6

www.stauff.com

STA-CK-305

Operating Instructions available online

 

Only use “gas approved" test hose

 

For use with nitrogen (N

2

) gas only

 

Safety goggles must be worn at all times

 

STAUFF pressure gauges are safety pattern type according to AS1349

Applying the Pre-charge Pressure (Topping up the Pre-charge Pressure) 
Charging Valve Connected Directly to Regulator

Typical Installation

Remove the accumulator gas valve protection cap and gas valve screw cap fitted to the gas side of the accumulator.

Refer to page 4 for connection flow chart

 

  Ensure regulator used is fitted with STAUFF SKK-20 fitting

 

 Make sure main valve on nitrogen gas bottle is closed

 

 Connect SDA-20 adaptor end (C) of charging valve (1) to  SKK-20 test coupling (3) fitted to the regulator

 

 Connect gauge + adaptor (4) to charging valve (A)

 

 Ensure that the bleed valve (D) on the charging Valve (1) is fully closed.

 

 Connect one end of the gas hose to the SKK test coupling (E) and the charging chuck adaptor (2)

 

 Connect remaining gas hose end to the charging valve connection (B)

 

 Ensure the tee handle on the charging chuck adaptor (2) is screwed back fully (turn anti-clockwise).

 

 Fit the charging chuck adaptor (2) to the gas valve on the accumulator. Be sure to not to overtighten.

 

  To open the gas valve fitted to the accumulator, slowly turn the tee handle on the charging chuck adaptor (2) clockwise until pressure 

is read on the gauge (4).

 

  Slowly open the valve on the nitrogen gas source and allow pressure to increase to the desired pre-charge setting. Wait until the 

temperature and pressure are stable, and if needed increase the pressure again to the required setting.

 

 When the pre-charge pressure (P0) is reach and has stabilised, close the valve of the nitrogen gas source.

 

  Close the gas valve fitted to the accumulator by turning the tee handle on the charging chuck adaptor (2) fully anti-clockwise. 

 

Open the bleed valve (D) to drain any residual pressure remaining in the charging chuck adaptor (2) Charging valve (1) and the gas 

hose (5)

    

 

Important: 

Do not over depress the gas valve fitted to the accumulator as this may result in a damaged gas valve.

    

 

Important: 

Do not over tighten the charging chuck adaptor (2) when fitting to the accumulator gas valve

    

 

Important:  

Do not attempt to remove the hose assembly from the fittings (B) or (E) whilst pressure is still monitored on the gauge (4)

    

 

Important:  

Do not attempt to remove the charging valve (1) by removing the test coupling (C) whilst pressure is still monitored on the 

gauge (4)

Содержание STA-CK-305

Страница 1: ...Direct Accumulator Charging Kit for USA Gas Valve STA CK 305 INSTRUCTION MANUAL ...

Страница 2: ...ging valve 1 which combines a bleed valve safety pattern gauge and 0 305 x 32 TPI charging chuck adaptor Features The standard kit is delivered in a storage case containing the following 1 1 x Charging valve 2 1 x STA CK CHRG HEAD 0 305 SKK20 for accumulator connection 3 1 x SKK 20 Test coupling 1 4 NPT for regulator connection 4 1 x Safety pattern pressure gauge 0 250 bar standard according to AS...

Страница 3: ...ls for checking gas pressure and pre charging pressure of accumulators only These items are not designed to be permanently attached to the accumulator during normal operation 7 Never use an accumulator in a hydraulic system without it first being pre charged with the correct nitrogen gas pressure Failure to do this will result in bladder or diaphragm damage 8 Ensure safety goggles are worn when ei...

Страница 4: ... Pre Charging Typical Installation USA 0 305 x 32 TPI Charging Chuck Adaptor STA CK CHRG HEAD 0 305 SKK20 5 2 SKK 20 Test Coupling 1 4 NPT for regulator connection Ensure appropriate thread sealing compound is applied prior to connection 3 Optional STAUFF Recommend the use of a Nitrogen Gas Regulator Safety Pattern Pressure Gauge Adaptor SMD 20 G1 4 4 Charging Valve 1 ...

Страница 5: ...ety patten gauge and adaptor 4 and couple directly to the SKK 20 fitting on the the charging chuck adaptor 2 Slowly turn the tee handle on the charging chuck adaptor 2 clockwise until pressure is indicated on the gauge Once the pressure measurement is read from the gauge turn the tee handle on the charging chuck adaptor 2 fully anti clockwise Remove the safety patten gauge and adaptor 4 from the c...

Страница 6: ...the charging chuck adaptor 2 to the gas valve on the accumulator Be sure to not to overtighten To open the gas valve fitted to the accumulator slowly turn the tee handle on the charging chuck adaptor 2 clockwise until pressure is read on the gauge 4 Slowly open the valve on the nitrogen gas source and allow pressure to increase to the desired pre charge setting Wait until the temperature and press...

Страница 7: ...amage to the gas valve Ensure that the bleed valve D is open so that some of the gas from the nitrogen gas source can be vented to air initially Slightly open the valve on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D After approx 20 seconds slowly close the bleed valve D allow pressure to increase Slowly increase the pressure from the nitrogen gas ...

Страница 8: ...el 39 0362 63 80 70 sales stauff it THAILAND STAUFF Thailand Co Ltd Tel 66 2 712 25 98 sales stauff co th CHINA STAUFF China Tel 86 21 68 18 70 00 info stauff com cn KOREA STAUFF Korea Ltd Tel 82 51 266 66 66 info stauff co kr UNITED KINGDOM STAUFF UK Ltd Tel 44 114 251 85 18 sales stauff co uk FRANCE STAUFF S A S Tel 33 2 54 50 55 50 direction stauffsa com MALAYSIA STAUFF South East Asia Sdn Bhd ...

Отзывы: