5 Operation
SPR-PRC-H
25 / 33
www.stauff.com
Fitting the workpiece
1
2
3
4
5
6
Fig. 16: Fitting the workpiece
1 Cap nut
2 Cutting ring
3 Tube end
4 Holding jaws
5 Counter retainer
6 Assembly stud
u
This is the way to fit the assembly stud:
1. Slip cap nut onto the tube. The thread must point towards the tube
end.
2. Then slip the cutting ring onto the tube end. In so doing, the cutting
edge of the cutting ring must point towards the tube end.
3. Press apart the holding devices of the counter retaining plate.
4. Insert the tube from above into the counter retainer and place on the
assembly stud. Cutting ring and cap nut are located between
assembly stud and counter retainer.
5. Slip the optional pressure sleeve between the holding jaws.
þ
Workpiece is prepared for the mounting.
Fit reinforcing sleeves for thin-walled tubes in keeping with the
STAUFF Product Catalogue!