2 / 12
2 / 12
安全须知
Safety instructions
本装配说明和装配步骤说明是 TÜV 和 UL 认证的重要组成部分
和先决条件。
These assembly instructions and the assembly steps and in-
structions described are an integral part of and prerequisite for
certification by TÜV and UL�
产品可由具备电气技能或受过此方面指导的人员依照适用的
安全法规进行装配或安装。
如您未遵守上述警告,则 Stäubli Electrical Connectors (Stäubli)
不承担任何责任。
The products may be assembled and installed by electrically
skilled or instructed persons duly observing all applicable safety
regulations�
Stäubli Electrical Connectors (Stäubli) does not accept any liabil-
ity in the event of failure to observe these warnings�
仅可使用 Stäubli 指定的组件和工具。自行装配时,切勿背离本手
册所述的制备及装配说明,否则 Stäubli 无法保证产品安全性或
性能达到官方技术参数。请勿以任何方式修改产品。
Use only the components and tools specified by Stäubli� In case
of self-assembly, do not deviate from the preparation and assem-
bly instructions as stated herein, otherwise Stäubli cannot give
any guarantee as to safety or conformity with the technical data�
Do not modify the product in any way�
非 Stäubli 原厂制造但可与 Stäubli 元件插合的连接器,以及其
他制造商声称“与 Stäubli 兼容”的连接器,均不符合长期稳定安
全的电连接要求。出于安全考虑,上述产品不得与 Stäubli 元件插
合在一起。因此,Stäubli 对此类连接器(即未经 Stäubli 批准)与
Stäubli 元件插合而造成的任何损失不承担任何责任。
Connectors not originally manufactured by Stäubli which can be
mated with Stäubli elements and in some cases are even de-
scribed as ”and/or MC4-compatible” by certain manufacturers
do not conform to the requirements for safe electrical connec-
tion with long-term stability, and for safety reasons must not be
plugged together with Stäubli elements� Stäubli therefore does
not accept any liability for any damages resulting from mating
such connectors (i�e� lacking Stäubli approval) with Stäubli ele-
ments�
IEC 60417-6042
注意电击风险
Caution, risk of electric shock
请在断电状态下工作
操作电气装置时,请遵守五项安全规定。
各电气装置确定后,应按照规定顺序执行以下五项基本要求(除
非另有必要理由):
- 完全分离;
- 确保不会重新连接;
- 确认无工作电压;
- 进行接地和短路;
- 针对临近带电部件提供防护。
任何从事此工作活动的人员均应具备电气技能或受过此方面指
导,或者由同等能力的人员监督。
来源:EN 50110-1:2013
Work in a de-energized state
Follow the five safety rules, when working on electrical installa-
tions�
After the respective electrical installations have been identified,
the following five essential requirements shall be undertaken in
the specified order unless there are essential reasons for doing
otherwise:
– disconnect completely;
– secure against re-connection;
– verify absence of operating voltage;
– carry out earthing and short-circuiting;
– provide protection against adjacent live parts�
Any person engaged in this work activity shall be electrically
skilled or instructed, or shall be supervised by such a person�
Source: EN 50110-1:2013
最终应用时,还应检查电击防护。
Protection against electric shock shall be checked in the end-use
applications too�
IEC 60417-6070
在负载下请勿断开连接
Do not disconnect under load
在负载下断开:禁止在负载下断开光伏连接器。可通过关闭直流/
交流转换器或切断交流电路,使其处于无载状态。
Disconnect Under Load: PV plug connections must not be dis-
connected while under load� They can be placed in a no load
state by switching off the DC/AC converter or breaking the AC
circuit�
Содержание PV-ADB4-EV0 2/2,5-UR
Страница 11: ...11 12 11 12 Notes...