9
LEFT SIDE
RIGHT SIDE
1
1
10
12
11
15
15
8
3
3
14
4
13
5
6
7
4
16
2
2
9
5
Figure 4. Left-Side and Right-Side Components
SIDE VIEWS
1.
Cleanout access panel, covers water heater cleanout opening
and ASME plate where applicable.
2.
CCB enclosure - see item 3 in
Components- Top View (All Models)
3. Intake air connection - three-inch PVC.
4.
Water heater 24-volt gas valve.
5.
Combustion Blower.
6. Water outlet - 1 1/2” NPT connection.
7.
UIM (user interface module). The UIM includes the display circuit
board and the control system’s LCD Touch Display. Used to
adjust various user settings and view operational information.
8.
Temperature-Pressure Relief Valve. See
9.
Temperature-Pressure Relief Valve discharge pipe - see
Valve Discharge Pipe Requirements
10.
Lower Temperature Probe, 1 of 2 temperature probes. The water
heater’s control system monitors this probe to detect water
temperature in the lower portion of the storage tank.
11.
Water inlet - 1 1/2” NPT connection.
12.
Water heater drain valve.
13. Supply gas line connection. See
.
14.
Low Gas Pressure switch, see item 9 in
for a description. See the gas pressure
15.
Vent Connection (Exhaust/Condensate Elbow) three-inch
aluminum.
16. Spark Ignition Transformer. When energized, sends the
electrical current to the spark igniter.
Содержание SUF 60120 THRU
Страница 67: ...67 WIRING DIAGRAM Figure 67 Wiring Diagram...
Страница 77: ...77 NOTES...
Страница 78: ...78 NOTES...
Страница 79: ...79 NOTES...