PKG08814-QRGMTL110 9
ENGLISH
MOUNTING FORCE GAGE
The DFC or DFG Force Gage is mounted to the gage
mounting plate using four M4 screws.
Position the force gage on to the gage mounting plate
so that the load cell stem points upward. Insert and
torque the four M4 mounting screws through the gage
mounting plate and into the force gage back panel.
Torque the screws to no more than 8.7 in-lb (1.0 N-m).
USING FIXTURES
The top test fixture arm is used to secure the top
test fixture. The test fixture arm has an adjustable
adapter plate that helps ensure proper alignment
with your force gage. The adapter plate has an M6
and a #10-32 hole for affixing your test fixture.
Rotate the adapter plate 180-degress to access the
desired hole size.
The two outside holes are used to secure the adapter
plate to the U-channel bracket.