Starfire SF-HC25G Скачать руководство пользователя страница 14

 

Clockwise pressure ratio increases the score (about 110: 1), the output voltage 
become  low,  100V  input  voltage,  for  example  the  partial  pressure  than  to 
maximum (110:1), the display of 45V block.   
 
Counterclockwise points pressure ratio (minimum about 40:1), namely the high 
output voltage and 100V input voltage, for example the partial pressure than to 
a minimum (bound), the block is shown as 125V.   
 
Partial  pressure  ratio  adjustment  potentiometer  factory  of  50:1,  try  not  to 
adjust. 
 

 

24V Positive 

Start arc control  Partial  pressure 

output 

24V 

ground 

9 core outlet 

2,5 

Screw 

terminal

 

24+ 

ST 

24- 

 
4. Parameters shows   
 
There  are  three  commonly  used  parameters  and  two  debugging:  1.  Set 
voltage.  2.  Starting  arc  delay.  3.  Locate  latency.  These  parameters  can  be 
directly set corresponding knob on the panel to adjust adjustment.   
 
1.  Set voltage, this can at any time by the knob to adjust the "height", on the 

left side of the digital tube display voltage value set, the unit: (V), clockwise 
to  increase  the  voltage,  counterclockwise  to  reduce  voltage.  Automatic 

Type 

Содержание SF-HC25G

Страница 1: ...SF HC25G Cutting torch height controller The user manualV1 2 http www starfcnc com 44 206...

Страница 2: ...ctrical installation connect 4 Parameters illustration 5 Use guide 5 1 Manual operation 5 2Automatic operation 6 CNC system and block adjustment for M instructions 6 1 CNC system control direct output...

Страница 3: ...torch between nozzle and the distance heighten of cutting board is very important to the stability it will directly affect the cutting speed and the quality of the incision Main engine Display settin...

Страница 4: ...fore install anduse this product must be strictly carried out in accordance with the details of the product system manual operation in order to ensure the correct use of the product About SF HC25G pla...

Страница 5: ...nsure the accuracy of the height control Please careful carry away and please do not intense collision vibration in order to avoid damage to the product Please don not do something without authorizati...

Страница 6: ...d adjustable of level 255 control of motor speedprecise several current setting short circuit protection Cutting with the function of collision When cut lips touch the steel plate the controller can q...

Страница 7: ...temperature 10 60 Weight 0 6 Kg Detection system isolation of arc electric subsection platen B2 type 3 Installation 3 1 Installation The related parts name of height controller location components ar...

Страница 8: ...1 4 communication line Bottom highly controller of the four M4 screw hole used for fixed box body onto the mounting plate Its size is shown in figure 3 1 5 You can also use DZ47 type guide rail insta...

Страница 9: ...Figure 3 1 5 Display setting panel uses two M4 screw to install installation dimensions such as figure 3 1 6 Figure 3 1 6...

Страница 10: ...nect 3 2 1 interface definition description Table 3 2 1connect lifting mechanism No Character Illustration Remark MOT Output Lifting motor MOT Output Lifting motor 24V Output For 3 lines close to the...

Страница 11: ...nect NC system power negative of output connection 0 OK Output After start arc to feedback signal Output as 0V DOW Input Manual decline signal connect NC decline output signal Low effective UP Input M...

Страница 12: ...Points linking piece 24V power positive supply Never to use others VOL INT Input After points linking piece action the voltage input ARCOUT Output Output to points linking piece of signal of the arc 2...

Страница 13: ...n introduced Points linking piece is after the plasma cutting torch arcing voltage according to certain proportion is reduced and according to the isolation of converted to reflect the cutting nozzle...

Страница 14: ...nt potentiometer factory of 50 1 try not to adjust 24V Positive Start arc control Partial pressure output 24V ground 9 core outlet 9 4 6 2 5 Screw terminal 24 ST V 24 4 Parameters shows There are thre...

Страница 15: ...ent too It should be set according to the actual situation Clockwise rotation for higher position height counterclockwise to reduce positioning height 4 The speed parameters the parameters for debuggi...

Страница 16: ...igital tube display not normal or up and down limit indicator lamp lights up at the same time and cannot perform any action Self checking by into working state and working state is divided into two ki...

Страница 17: ...ignment is complete Start arc output after the completion of the initial positioning output and arc signal to the plasma power such as waiting for a time after acquisition of arc voltage Start arc suc...

Страница 18: ...rom 0 no there is no any arc pressure delayed perforation delay seconds 4 If the parameter is set in the arc pressure detection choose 1 testing arc pressure measurement waiting for the starting arc s...

Страница 19: ...el communication line To reconnect or replace communication line Above limit alarm lights Running more than mechanical upper limit Check the high limit switch Lower limit alarm lights Running more tha...

Страница 20: ...8 Appendix 2LineNPN normal shut series connection method 2 Line NPN normal open parallel methods 3LineNPN normal shut series connection method 3 Line NPN normal open parallel methods...

Страница 21: ...FIRE control technology co LTD Address HAITE garden 204 44 floors Shi Jing Shan district Beijing city Zip code 100041 Sales 010 88909875 Technical support 010 88797100 Website http www starfcnc com E...

Отзывы: