background image

STAR TRAC E-ST STEPPER 

Install Guide

(b)  It  is  now  time  to  attach  the  display.   

NOTE:  This  step

assumes that you will be attaching the LED display.  Should you

be installing the embedded display or adding a PVS kit, please

refer to those applicable manuals.

The following display con-

nections will need to be made:  connect the main display cable

to  the connector  labeled  J4  on  the  display  PCB,  connect  the

heart rate grip cable to the heart rate board, and connect the

ground wire from the heart rate board to the quick disconnect

tab on the display weldment.

(c)  With  the  display  electrical  connections  made,  you  can  now

attach the display.  There are 2 tabs located on the bottom of the

display  weldment,  so  in  order  to  attach  the  display,  you  will  first

need to guide the bottom of the display under the tabs and then

second you will need pivot the display forward around the tabs to

mate the display to the rear plastics.  Once in place, you can attach

the screws.

(d) With the display in place, attach the 8 M4 x 0.7 screws provided.

6 screws go around the rear of the display and 2 go near the under-

side of the cupholders as shown.

5.

Installing the Handrails

NOTE: It is recommended that this step be performed by at least 2 people.

(a) With the assistance of another person, tip the 

STAR TRAC E-ST STEP-

PER

forward and hold in place while completing the following steps.

(b) Remove the 2 rear leg levelers.
(c) 

Slide the

 left handrail 

into

 the upper end

 of the left handlebar

 weldment and line up the screw holes.
(d) Loosely attach 2 supplied 

button head 

screws to the left handlebar 

weld

ment junction using a 5/32” (4mm) hex key or T-handle.

Board

1

ST

2

ND

J4

Ground Wire

Heart Rate

Board

Quick Disconnect

M4 x 0.7

Screws

Отзывы: