![Star Manufacturing International 49 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/star-manufacturing-international/49/49_installation-and-operating-instructions-manual_1362550002.webp)
2
GENERAL INSTALLATION DATA
CAUTION
This equipment is designed and sold for
commercial use only by personnel trained
and experienced in its operation and is not
sold for consumer use in and around the
home nor for use directly by the general
public in food service locations. For
equipment to be used by the general
public, please contact the factory.
THOUROUGHLY INSPECT YOUR
MACHINE ON ARRIVAL
We do everything in our power to insure
delivery of your machine in perfect
condition. However there are instances in
which the unit may be damaged in transit,
in the event your unit is damaged in
transit, have the transportation company
make the necessary notations on your
freight bill or delivery receipt. Immediately
report this damage to the dealer from
whom you purchased the machine. The
dealer will advise proper handling
Instructions. If damage is not discovered
until after delivery has been made, notify
the transportation company immediately.
However, in each instance, request an
inspection report to cover whatever damage
has occured in transit.
INSTALLATION
Each machine has been properly wired
and inspected at the Factory for operation
on the Voltage and type of Current
specified on the nameplate.
CAUTION
Do not connect to any other type of
current or the machine will be seriously
damaged.
A receptacle is furnished with the 89
Series Popcorn machines. We strongly
recommend installation by a Licensed
Electrician. The guarantee of this machine
as covered by the Warranty Card does not
apply if an improper installation has been
made.
120 VOLT MACHINES
Machines with nameplate stamped 120V,
are equipped for operation on 120 Volt, 2
wire, 60 Cycle AC single phase service
and must be connected to a separate 20
Amp circuit with a 3 wire grounded,
polarized receptacle.
240 VOLT MACHINES
Machines with nameplate stamped 240V,
are equipped for operation on 240 Volt, 2
wire, 60 Cycle AC single phase service
and must be connected to a separate 15
Amp circuit with a 3 wire grounded,
polarized receptacle.
GENERAL OPERATING
INSTRUCTIONS
CAUTION
The motor air intake and exhaust holes
located on top of the machine must be
clear of any obstruction.
DO NOT COVER THESE AIR VENT HOLES
as serious damage will result.
Check to insure the installation of the
Corn Drawer before the Popping cycle is
started. See picture for location of Corn
Drawer.
With all switches in the "OFF" position,
proceed in the following sequence to Pop
Corn:
1.)
Turn "ON" the Corn Warming switch.
This switch controls the Bottom heating
element, the Top heating lamp and the
Sign diplay lamps of the Sign Lighted
models.
2.)
Turn "ON" the Kettle switch. This
switch controls the Kettle heating
element. The Red pilot light is provided to
indicate when the Kettle switch is "ON".
Allow six to seven minutes to pre-heat the
Kettle. The Kettle heating element is
thermostatically controlled. Thermostat
adjustments should not be necessary as it
has been preset at the factory for the
correct popping temperature.