![Stam Audio SA-76 ADG Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/stam-audio/sa-76-adg/sa-76-adg_user-manual_1358396010.webp)
STAM AUDIO ENGINEERING
7. Once the GR Meter accurately tracks, as reflected by the external reference meter,
bypass the Gain Reduction and note the movement of the GR meter pointer.
8. Adjust R155 to reset the meter pointer to 0 VU, (no gain reduction).
9. Re-engage compression by pressing the 20:1 ratio. The tracking probably moved a little.
10. Re-adjust R154 to show actual gain reduction. Bypass compression again and re-adjust
R155 so that the pointer is again at 0VU. Each time you step through the procedure, the
meter should move less off its mark than in the previous attempt at calibration. It is not
uncommon to have to repeat the steps 5-6 times before they both lock in and stay where
they should.
11. Congratulations, you’ve just calibrated your ADG to factory conditions.
SA-76 ADG - USER MANUAL
PAGE 10