Initial start-up
Operating Instructions ET-xx8 / MT-xx8
R. STAHL HMI Systems GmbH / OI_ET_MT-xx8_en_V_01_02_03.docx / 10.03.2021
Page 45 of 84
9
Initial start-up
Conditons:
The device has been installed correctly.
The device has been connected to the equipotential bonding.
1. Since factors such as storage or temperature can have an impact on the cables and cable
glands, check the following connections:
o
Connection terminals
o
Existing screw connections
2. Switch on power supply.
o
The device will start up in its standard configuration.
3. Follow the instructions on the screen.
10 (Re-) Commissioning
1. Check the device is correctly installed:
o
Connection terminals
o
Existing screw connections
2. Check the device for visible damage.
o
Only commission the device if there is no visible damage and if it has been correctly
installed.
3. Switch on power supply.
o
The device will start up with the configuration saved last.
o
If the connected systems can be reached, communication will be established within the
existing parameters.