134784 / 8125612300
2013-01-18·BA00·III·en·05
Commissioning
13
Control Panels and Distribution Systems
8125/5, 8125/8
The following work is required after finishing electrical installation:
Attach protection against contact.
Set nominal values in all release devices.
Check visually if there are loose metal parts, soiling or traces of moisture.
If any, clean and dry the enclosure.
Connecting to the mains
Open the enclosure.
Lead the connecting cables with intact external insulation jackets through the cable
entry.
Lay the connecting cables so that the minimum permissible bending radii are
achieved.
The protective earth conductor must always be connected.
Remove loose metal particles, dirt and traces of moisture from the terminal
compartment, if any.
Carefully close the enclosure after finishing the work.
Test the insulation in accordance with IEC/EN 60439-1.
9
Commissioning
Before commissioning
Make sure that the device is not damaged.
Make sure that the device is installed correctly.
Remove any foreign object from the device.
Check that cable entries and stopping plugs are tight.
Check that screws and nuts are tightly fitted.
Inspect cable entry for damage.
Check tightening torques.
Make sure that unused cable entries are sealed with plugs certified according to
Directive 94/9/EC, and unused holes are sealed by stopping plugs certified according
to Directive 94/9/EC.
Check whether all covers and barriers for live parts are installed and fixed.
Please make sure to consult the enclosed documentation such as wiring
diagrams or similar.
We recommend the use of type 8290 stopping plugs for unused holes and
type 8161 plugs for unused cable entries in the enclosure. Both are available
from R. STAHL Schaltgeräte GmbH.
Содержание 8125/5
Страница 2: ......
Страница 20: ...Zubehör und Ersatzteile 18 134784 8125612300 2013 01 18 BA00 III de 05 Steuerung und Verteilung 8125 5 8125 8 ...
Страница 38: ......
Страница 39: ......
Страница 40: ...134784 8125612300 2013 01 18 BA00 III de en 05 ...