262224 / 807460300090
2017-07-31·BA00·III·en·00
Commissioning
17
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Position Switches
Series 8074/2
7.3.5 Cable Entry Assembly
8
Commissioning
Before commissioning, ensure the following:
• Check to see if the enclosure is damaged.
• Check to see if parts of the flameproof enclosure are damaged.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check to see if the conductors / wires have been installed properly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
9
Maintenance and Repair
9.1
Maintenance
• Consult the relevant national regulations to determine the type and extent of
inspections.
• Adapt inspection intervals according to the operating conditions.
At a minimum, check the following points during maintenance work on the device:
• Firm fit of the conductors,
• Compliance with the permissible temperatures (according to IEC/EN 60079),
• Damage to the enclosure and seals.
Cable entry assembly, see Brief Instructions attached.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Содержание 8074/2 Series
Страница 2: ......
Страница 22: ......
Страница 42: ...137193 8146620300 2014 06 26 BA00 III de en 05...
Страница 62: ......