
STEP 1 POSITIONING & MOUNTING
The Model SS980 is designed to mount behind the truck cab across the frame rail sides.
A) Diagram A illustrates the mounting of the SS980 series. Allow a minimum of 4” on both
sides of the unit for proper airflow.
STEP 2 INSTALLING THE PTO & HYDRAULIC PUMP
A) Install the PTO to the transmission and mount the hydraulic pump according to
the instructions included with the PTO.
HELPFUL HINT
:
If you are using a direct mount hydraulic pump/PTO combination,
be sure that the pump splines are well lubrication with a heavy grease. This grease will
prevent premature spline wear on the PTO and pump shafts. Also available from both
MUNCIE and CHELSEA is a new option for a greaseable shaft. This option allows you
to grease these splines without pulling the pump off the PTO.
DIAGRAM A
INSTALLATION GUIDE , OPERATING PROCEDURES & PARTS BREAKDOWN
PAGE 2
STAC INC
l
ST PAUL MN
l
800-334-7699
Mobile Hydraulic Systems
®
FRAME RAIL
FRAME RAIL
Содержание THERMAFLOW SS980H
Страница 2: ......