STA-RITE DB10018T Скачать руководство пользователя страница 7

Installation

7

2. Wrap the threads of the close nipple (Key No. 4 on

Page 12) counterclockwise with 2 turns of Teflon

TM

tape and set aside.

NOTICE:

There must be a check valve installed in

the Primary Sump Pump discharge pipe between the
tee and the Primary Sump Pump. This will prevent
recirculation into the Primary Pump when the
Backup Sump Pump comes on.

3. The backup pump (Key No. 6) and check valve

assembly (Key Nos. 5A and 5B) come preassembled.
Thread the close pipe nipple into the check valve.

4. To thread the tee (Key No. 2) into the close nipple:

Hold the check valve with the channel locks, insert
the screwdriver into the tee for leverage, and tighten
the tee with the screwdriver. Finish with the tee in a
straight up and down (vertical) position.

5. Clean the pipe ends with the cloth towel. 

6. Glue the cut-off piece of discharge pipe into the top

of the tee. 

NOTICE:

If your pipe is 1-1/4”, you will need to glue

the reducer bushings into the tee and glue the pipe
into the bushing. Place the assembly onto the prima-
ry discharge pipe. Do not glue the tee onto the pri-
mary pump discharge pipe.

7. Mount the back-up pump float switch assembly (Key

No. 8) loosely to the discharge pipe with the cable ties
(Key Nos. 8A & 8B). See Figure 6, on Page 6.
Approximately 2.5” (63.5 mm) of cord length should
be left between the float and the clamp. Do not tight-
en the cable ties. Adjustments may be needed later. 

Cut the Discharge Pipe:

1. Put the double pump assembly into the sump pit. 

NOTICE: 

The discharge pipe now overlaps the dis-

charge pipe that leads outside. 

2. Mark the discharge pipe where it should be cut.  Be

sure to leave a 1/4” air gap between the ends of the
pipes. This gap will absorb the noise from vibration
and allow for flexibility. 

3. Make the third cut. See Figure 8.

TRIAL ASSEMBLY OF DOUBLE PUMP

ASSEMBLY IN THE SUMP PIT:

1. Connect the discharge pipe to the exterior discharge

pipe with the rubber coupling and clamp kit (Key
No. 1). Do not tighten the clamps until all the final
adjustments are complete. 

2. Make the final adjustments. Make sure the pumps

and the switches do not interfere with each other.
Make sure there is plenty of room for the float
switches to either swing or to move up and down
from their “off” to their “on” positions.

Mark and Glue Assembly:

1. Mark the pipe and the fittings at all the connections

with a pencil. These marks will be used as a reassem-
bly guide while gluing to be sure everything is still in
the right place and nothing has moved.

2. Loosen the rubber coupling and clamp connection.

3. Carefully pull the double pump assembly back out of

the pit. 

4. Take the tee assembly off of the primary discharge

pipe. 

Do Not

unscrew any of the Teflon

TM

taped pipe

nipple connections. 

5. Clean all the PVC pipe ends with the PVC cleaner.

Hazardous fumes. 

Follow the cement

and cleaner manufacturers instructions. Use the PVC
cement in a well ventilated area away from fire or
flames.

6. Glue the PVC fittings where indicated by the pencil

marks. Wait 10 minutes for the glue to cure.

Final Assembly:

1. Put the double pump assembly back into the pit. 

2. Install and tighten the rubber coupling and clamp kit.

3. Make the final float switch adjustments and tighten

the cable ties. 

1/4" air gap

Make the Third Cut
(the overlap plus
the 1/4" air gap).

Exterior
discharge
pipe

Exterior
discharge
pipe

Method A

Method B

overlap

overlap

Sump basin
inlet pipe (from
drain tiles to 
sump basin).

Note:  Always install the back-up sump pump as close
to the bottom of the sump pit as possible.

2"

2"

Previously marked
"on" water level
of Primary Sump Pump.
(See Figure 1, Page 4)

Recommended Minimum

Figure 8 – Make the third cut to remove the excess dis-
charge pipe

Содержание DB10018T

Страница 1: ...AL AR M A C PO WER ON MIC RO PR OC ES SO R CO NT RO LLE D 5 STA GE BAT TER Y CH AR GE MA INT AIN ER 12 VOLT 8 AMP ALW AYS REA D WAR NING S IN INST RUC TION MAN UAL BEF ORE USIN G 3466 0799 SR DB10018T DB20018T 293 Wright Street Delavan WI 53115 2002 Sta Rite Industries Inc Printed in U S A S521 Rev 8 2 02 Installation Operation Parts For further operating installation or maintenance assistance Cal...

Страница 2: ...3 Use this system only for backup sump pump duty in a residential application It is not designed as a pri mary sump pump 4 Do not lift pump by electrical cord Risk of electrical shock Do not lift the pump by the electrical cord lift pump only by the dis charge pipe lifting ring or handle on the pump Lifting by the cord can damage the cord 5 Pump clear water only with this pump 6 Pump is permanentl...

Страница 3: ...a phase converter or if three leg ambient compensated extra quick trip overload relays of recommended size are not used our warranty is void Buyer s only remedy and Sta Rite Industries Inc s only duty is to repair or replace defective products at Sta Rite Industries Inc s choice Buyer agrees to pay all labor and shipping charges associated with this warranty and to request warranty ser vice throug...

Страница 4: ...must be pumped down as low as possible before going on to the next step To drain the sump pit follow either step 2A or 2B below 2A Raise the float on the float switch until the pump turns on Use a wooden broom handle or a stick to do this 2B If the sump pump has a piggy back type power cord remove the float switch power cord plug from the outlet and plug the pump power cord plug directly into the ...

Страница 5: ... basin diameter at the bottom of the pit and the rec ommended depth of the sump basin is 18 Some additional materials you will need are 2 1 1 4 90 elbows and 2 1 1 4 close pipe nipples Figure 5 Remove the pre assembled check valve Battery Back up Pump comes preassembled with the check valve assembly installed on the discharge Remove this check valve assembly Elbow Back up Pump Discharge Tee Check ...

Страница 6: ...gs into the tee first and then slip the cut off piece of discharge pipe into the bushing 12 Slip the tee and the back up pump subassembly onto the reducer bushing 13 Glue the cut off piece of pipe into the top of the reducer bushing in the top of the tee 14 Mount the float switch assembly Key No 8 loosely to the discharge pipe with the cable ties Key Nos 8A 8B See Figure 6 Approximately 2 5 63 5 m...

Страница 7: ...lity 3 Make the third cut See Figure 8 TRIAL ASSEMBLY OF DOUBLE PUMP ASSEMBLY IN THE SUMP PIT 1 Connect the discharge pipe to the exterior discharge pipe with the rubber coupling and clamp kit Key No 1 Do not tighten the clamps until all the final adjustments are complete 2 Make the final adjustments Make sure the pumps and the switches do not interfere with each other Make sure there is plenty of...

Страница 8: ...TION REPLACE FUSE WITH SAME 20 AMP 36V TYPE AND RATING ONLY PUMP FUSE CONNECTION DISABLE ENABLE AUDIBLE ALARM DISABLE WHEN LIT 20 Figure 9 Wiring Connections DB10018T Connect the To the Junction Box s Positive lead from the battery Positive battery connection Negative lead from the battery Negative battery connection Positive lead from the charger Positive charger connection Negative lead from the...

Страница 9: ...ATUS ÉTAT DE FONCTIONNEMENT DE LA POMPE ESTADO DE FUNCIONAMIENTO DE LA BOMBA A C POWER STATUS 3464 0799 ÉTAT DU COURANT ALTERNATIF ESTADO DE LA CORRIENTE ALTERNA SILENCE ARRÉT SILENCIO ALARM ALARME ALARMA RESET RÉARMEMENT REPOSICIÓN Figure 12 DB20018T LED Panel Bicolor LED flashing Failed pre qualification test Yellow Green alternatively New battery may be needed Red Pump Run Battery voltage is gr...

Страница 10: ...lls are being equalized This stage requires two hours to complete 4 Green LED light on indicates Float charge stage Battery is charged and ready for use Charging has stopped To maintain a full charge on the battery the yellow and green LED may alter nately turn back on This means the charger is briefly turning back on to keep the battery voltage from falling below a preset voltage level The 5 Stag...

Страница 11: ...f a standard automobile battery with this charger is not recommended An automobile battery may require charging after only 1 2 hours of continuous use and the repeated charging cycles may cause early plate failure in the battery The maximum allowable size of a battery is 12 5 8 long 7 wide and 9 3 8 high 320 7mm x 177 8mm x 238mm including terminals so it will fit in the battery box BATTERY MAINTE...

Страница 12: ...des 1 1 2 x 1 1 4 Reducer Bushings 2 Included with Key No 11 Not illustrated Purchase locally Included with Key No 2 Key No Part Description DB10018T DB20018T 1 Rubber Hose Coupling and Clamps U74 68 U74 68 2 PVC Tee 1 1 2 x 1 1 2 Slip x 1 1 4 FNPTW 1 1 4 U78 846P U78 846P 3 Reducer Bushing 4 PVC Pipe Nipple 1 1 4 NPT x Close U37 66P U37 66P 5A Coupling 1 1 4 FNPT x 1 1 4 FNPT U212 261P U212 261P ...

Отзывы: