A 12VDC supply should be able to provide a peak current of 4.0A
and be fused at 6.3A.
●
A 24VDC supply should be able to provide a peak current of 3.0A
and should be fused at 5.0A.
3.5 Grounding the AIS transceiver
An M4 grounding screw and ring crimp are provided in the fixing kit to allow
connection to the grounding point on the rear of the AIS transceiver chassis as
indicated in Figure 17.
Figure 17 Grounding the AIS transceiver
This product must be connected to protective ground via the
ground connection point. It is essential that the ground
connection point is used in all installations, regardless of what
other equipment is connected. The ground connection point
must be bonded to protective ground using as short a
connection as possible.
Ground screw
and ring crimp
!
Содержание 427-0002B
Страница 1: ...AIS Class B transceiver Installation and operation manual ...
Страница 16: ...Notices Page 14 ...
Страница 18: ...Introduction Page 16 ...
Страница 24: ...Installation and configuration Page 22 Figure 5 Desk mounting the AIS transceiver ...
Страница 66: ...Technical information Page 64 ...
Страница 74: ...Technical specification Page 72 ...
Страница 75: ......
Страница 76: ...201 0707 1 Manufacturer s code 427 NMEA 2000 Product code xxxxx ...