SR
SYSTEM-ELEKTRONIK GmbH
|
Eschachstr. 23
|
D-78078 Niedereschach
|
phone +49 77289268-0
|
Seite | 9
Putting the TFT monitor into operation
Unpack device
The device is delivered in a sturdy cardboard box. The device is fixed in place and protected
from damage during transport by the tensioned Swing foil. Keep all parts for the time being
in order to have suitable transport packaging in case of a necessary return.
Check the device and the accessories supplied for transport damage. If damage is visible on the
device, it must not be put into operation, as safety could be impaired. Contact the sender
immediately!
Check the scope of delivery against the delivery bill.
Installation of the device unit
The device must not be exposed to excessive cold, heat, moisture or dirt. The ambient
conditions specified in the "Technical data" must be observed to maintain operational
safety!
Before attaching the device to a VESA mount, check whether the maximum permissible
weight for the mount is observed. This is specified by the manufacturer.
When mounting the device, make sure that sufficient ventilation of the device unit is
ensured.
Make sure that there is sufficient space for the connections and that no sharp edges or
corners protrude in this area. This could result in damage to the connection cables and
impair the function and safety.
Threaded bolts may be tightened to a maximum of 2.6 Nm!