FASE 8
Inserire 1 vite M8x20TB, 1 M8X25TB e 2 tasselli 13x25S come
indicato in fig.10. ripetere l’operazione con l’altro profilato C.
STEP 8
Insert 1 M8x20TB, 1 M8X25TB screws and 2 13x25S dowels as
shown in pic.10. Repeat the operation with the other C profile.
11
Figura 10
M8X25TB
M8X20TB