background image

73

Technical Manual Gear Hub Systems 2010  ·  

GEN.0000000002002  ·  Rev. A

SRAM

®

 S7

MAINTENANCE

R E A S S E M B L Y   H U B

see Fig. 1

Lubrication see “MAINTENANCE / 
LUBRICATION

“.

•  Insert into the axle (on the side with the 

internal thread):
Short compression spring (21), thrust 
block (20) – it is the same both sides, guide 
rod (19) – it is the same both sides, long 
compression spring (18).

•  Compress spring and fit grub screw (17).
•  Clamp axle, end with groove for 

Clickbox facing upwards.

•  Fit plastic profile washer (22) with its 

large diameter upwards.

•  Fit thrust washer (23) and retaining 

washer (24).

•  Locate cover (25), compression spring (26) 

with 7 turns and cover (27, insides to the 
spring).

•  Compress spring and position thrust 

block (28) – it is the same both sides – 
centrally in the axle.

•  Clamp other axle end (groove is facing 

downwards).

•  Fit large sun gear (15), with deflector 

bevels upwards.

•  Position medium sun gear (14), with 

deflector bevels upwards.

•  Fit small sun gear (13) – with recesses in 

front, thrust block engages in the slots.

•  Position smallest compression spring (12).
•  Fit 1 mm thick washer (11).
•  Fit planetary gear carrier (10):

Place the mounting aid

(Fig. 2)

 on the 

planetary gear carrier such that the 
markings (X) on the 3 small planet gears 
and the mounting aid match up.

•  Turn planetary gear carrier and at the 

same time push it downwards over the 
sun gears.

•  Fit thrust washer (9) and retaining 

washer (8) in the undercut.

  Now remove the mounting aid.

Advice:
If the gears are not accurately assembled 
the hub may feel tight in use. This may 
lead to gear wheel damage during travel.

•  Clamp other axle end (groove for 

Clickbox facing upwards).

•  Fit coupling gear (29) with carrier plate 

downwards

•  Push ring gear (30) over the coupling 

gear.

•  Locate large spring (31).
•  Fit largest ball retainer (34) with balls 

underneath.

•  Fit cover (32, inside to the spring).
•  Assemble the compression spring (33) 

with 12 turns.

•  Position driver (35) – push it down – and 

screw on fixed cone (36) to the stop, 
tightening torque 20 Nm (177 in.lbs.).

•  Clamp other axle end (groove for 

Clickbox is facing downwards).

•  Assemble hub shell (6) with a slight 

counter-clockwise movement.
In case the hub shell jams, position the 
plastic ring 

(Fig. 3) 

correctly. The plastic  

ring is only fitted to some hub versions.

•  Screw brake cone (7) clockwise onto 

the planetary gear carrier (10) until it 
stops.

•  Insert 3 brake segments (5).
•  Turn in friction spring (3) counterclock-

wise into the lever cone (2) (inlying 
winding of the spring has to lie against 
the lever cone) 

(Fig. 4)

•  Insert ball retainer (4) (balls are facing 

upwards) into lever cone (2): the 3 re-
cesses have to engage into the retaining 
lugs of the lever cone. Slightly turn ball 
retainer to prevent it from falling off.

•  Fit lever cone onto hub shell: the 

retaining lugs of the lever cone have to 
engage into the openings between the 
brake segments. Make sure that lever 
cone engages while turning it back and 
forth slightly.

•  Screw on locknuts (1), adjust bearing 

so that there is no play and lock nuts 
together with 15 – 20 Nm (133 – 177in.lbs.).

Caution:
Check that all the brake system 
components are functioning properly!

Advice:
Dismantling and reassembly of hub ver-
sion without brake should be carried out 
in the same way. 
Differences: Instead of brake segments / 
cone a click-and-pawl carrier is installed 
on the planetary gear carrier.

4

Отзывы: