Maintenance
Waukesha Cherry-Burrell
Page 54
95-03057
11/2012
5.
Remove the three (3) bolts holding front jacket cover in place.
6.
Remove the non-driven product head from mutator shaft.
7.
Reattach head to tube. See Figure 50. Reattach shaft nut
cover and clamp, and use lift to position non-driven end head.
8.
Loosen bolts on jacket flange.
9.
Lower head slightly with hydraulic cylinder to allow tube to
move down.
NOTE:
Tube may slide out easily or it may need coaxing out.
10. Lower lift arm slightly to allow tube to move down. At the 12,
6, 3, and 9 o’clock positions, tube flange is threaded for jack
screws. Thread two (2) bolts into either the 12 & 6 or 3 & 9
o’clock positions.
11. Tighten bolts about 1/2 turn alternately on each side until
flange loosens from jacket. It may be necessary to lower foot
on hydraulic cylinder slightly while removing tube from jacket.
Figure 49 - Remove Front Jacket
Cover Bolts
Figure 50 - Head Reinstalled
Figure 51 - Insert Jack Screws