20
Installation
CRL/EN (1810) 2.2
3.4
Mounting OH3 pump
3.4.1
Installation of a pump unit
Pump and motor shafts of complete pump units are adjusted perfectly in line in the
works.
1 In case of permanent arrangement place the base plate level on the foundation with
the aid of shims.
2 Carefully tighten the nuts on the foundation bolts.
3 Check the alignment of pump and motor shafts and if necessary realign, see
paragraph 3.4.3 "Alignment of the coupling".
3.4.2
Assembling a pump unit
If the pump and the electric motor still have to be assembled, do the following:
1 Remove the front guards (0270). Check if there is a key in both shaft ends.
2 Clean the motor and pump shaft. Grease both shaft ends with mounting grease.
3 Fit both halves of the coupling to the pump shaft and the motor shaft respectively. The
front of the hub must be flush with the shaft end.
4 Align the coupling in accordance with the following instructions.
3.4.3
Alignment of the coupling
Use bolts (0890) to position the electric motor in such a way that the coupling halves are
aligned correctly.
For couplings use a dial indicator as figure 3 shown. The alignment values are maximums
for continuous service, see paragraph 3.4.4 "Tolerances for aligning the coupling".
Figure 3:
Aligning the coupling, A= Parallel, B= Angular.
A
B
Содержание Johnson Pump CombiProLine OH3
Страница 2: ......
Страница 4: ...2 EC EN 1712 6 0 ...
Страница 6: ...4 INT EN 1512 1 2 ...
Страница 10: ...8 CRL EN 1810 2 2 ...
Страница 20: ...18 General CRL EN 1810 2 2 ...
Страница 39: ...CRL EN 1810 2 2 Dimensions 37 CombiProLine 8 Dimensions For dimension see GAD enclosed with the delivery ...
Страница 40: ...38 Dimensions CRL EN 1810 2 2 ...
Страница 52: ...50 Parts CRL EN 1810 2 2 ...
Страница 66: ...64 ORDFORM 1512 3 3 EN ...