
Operation
Waukesha Cherry-Burrell
®
Brand Universal 3 Pump
Page 26
95-03103
02/2021
Starting the Pump
WARNING
Keep a safe distance (1.6 ft/.5 m) away from the pump during
startup.
CAUTION
The motor must be installed by qualified personnel, e.g., a
licensed electrician.
WARNING
In order to avoid temperature shock after the introduction of hot
or cold product, stop the pump before filling the pumphead with
product. Once the product has filled the pumphead, allow up to
15 minutes for the pump’s fluid components to thermally adjust,
then re-start the pump.
1. Start the pump drive. Where possible, start at a slow speed
or jog.
2. For sanitary applications, sanitize the pump per customer
requirements before putting the pump into service.
3. Check to make sure that the liquid is reaching the pump. If
pumping does not begin and stabilize, check “Troubleshoot-
ing” on page 92.
Stopping the Pump
WARNING
Keep a safe distance (1.6 ft/.5 m) away from the pump during
shutdown.
CAUTION
The motor must be installed by qualified personnel, e.g., a
licensed electrician.
1. Shut off the power to the pump drive.
2. Shut off the supply and discharge lines.
Содержание 006-U3
Страница 2: ......
Страница 134: ...Maintenance Summary Waukesha Cherry Burrell Brand Universal 3 Pump Page 134 95 03103 02 2021 Notes...
Страница 135: ......