1
2
1
2
L08A
L08E
L08B
D
D
Y4
L08E
D
D
L08E
3
4
D
D
D
W02
W02
L08A
L08E
D
W02
W02
L08E
L08B
3
4
W03
W03
4
Adjust the screws in connector D to a horizontal position and
insert connector D into L08E, then insert the whole part into
L08A & B and tighten them gently.
Slide 4 x W02 into each profile, then adjust the screws
in connector D to a horizontal position and insert
each connector D into each profile, tighten them gently.
Finally secure 2 x W03 brackets in the top(see Fig. above).
Slide panel Y4 into the channels of
L08A & B and cover Y4 with another
L08E to complete the first door.
Содержание NURSERY GREENHOUSE
Страница 3: ...1 L08B PART NO Qty L08A 1 L08E 2 D 4 Y4 1 W03 2 W02 4 3 Door1 Frame Assembly ...
Страница 5: ...1 L08D PART NO Qty L08C 1 L08E 2 D 4 Y4 1 W03 2 W02 4 5 Door2 Frame Assembly ...
Страница 8: ...PART NO Qty L01B 4 L05A 1 C 6 Y3 1 W02 4 L05B 1 3 Z01 L15A 1 L05C 1 Roof Frame Assembly 8 Ø4X16D ...
Страница 15: ...15 Y2 25 ...
Страница 17: ...17 W02 W02 W02 27 Slide each W02 into each end of L06A x1 x1 ...
Страница 19: ...W03 W03 W03 W03 W03 W03 W03 W03 W03 W03 33 33 Install 8 x W03 in each corner 19 ...
Страница 20: ...L07A 34 34 Insert L07A into L03A B and tighten them gently see Fig above 20 ...
Страница 21: ...Y5 Y5 35 35 Y1 Y1 21 ...
Страница 24: ...L09 6 L10 33 W01 12 66 Z01 PART NO Qty Final Assembly 24 Ø4X16D ...
Страница 27: ...3 shelves 44 27 Put each shelf onto each W01 ...