background image

7

ALU. Box No.4

ALU. Box No. 4

(2 Section Assembly)

L02A

2

QTY.

NO.

PART

L02B

2

L05C

2

L05D

2

L05B

2

L04B

2

L02F

2

L03B

2

L03A

2

L02H

2

L02K

1

QTY.

NO.

PART

W06

4

J04

2

G

2

H

1

C

2

W02

2

W03

2

W07

2

L08B

2

L06

1

L07

2

L09

2

L15A

2

L19

4

L20

2

L21

2

L04E

2

L22

3

QTY.

NO.

PART

90

4

12

8

4
4

86

8

W05

S01

S02

M01

Z02

Z03

Z04

S03

J06

2

J05

1

QTY.

NO.

PART

W08

2

W08A 2

S05

M5X35

M05

M5

8

8

M06

M5

8

M6X12

M6X20

M6

Ø

4X16D

Ø

5X30

Ø

4X10

M8X60

Содержание GRANGE - 5

Страница 1: ...1CTN 1CTN etc 1CTN 1CTN 1CTN 1CTN 1CTN etc 1CTN 2CTN 3CTN 4CTN 1CTN 1CTN 1CTN 1CTN 1CTN 400x500x302CM 600x500x302CM 800x500x302CM 1000x500x302CM ALU No 2 ALU No 3 ALU No 4 Assembly Instructions MODEL...

Страница 2: ...hen handling components Always wear gloves shoes and safety goggles during assembly 3 DO NOT climb or stand on the roof heavy articles should not be leaned against the greenhouse 4 Keep roof and gutte...

Страница 3: ...with the expansion bolts provided alternatively you can easily secure it to a timber base with timber screws not provided 8 Each Polycarbonate Panel comes with UV protected properties Please ensure t...

Страница 4: ...hite film facing inside and the clear film with writing facing the sun If you have any questions please feel free to contact us Head Office Mon Fri 9am 4pm 14 Crown Street South Geelong VIC 3220 PH 13...

Страница 5: ...08B 2 L04D 8 L02C 2 L02F 3 L02D 2 L02G 4 L04E 2 L03C 1 L03D 1 L05B 2 L02E 1 L02A 2 QTY NO PART L02B 2 L05C 2 L05D 2 L05B 2 L04B 2 L02F 2 L01B 2 L01C 2 QTY NO PART L08B 2 L06 1 L07 2 L09 2 L15A 2 L19 4...

Страница 6: ...1 L17 1 L05H 4 A 2 B 2 C 4 D 2 E 2 F 2 175 W01 10 179 W04 1 QTY NO PART J03R L 2 2 J04 4 J01 2 J02R L 2 2 14 14 30 T08 4 W05 M01 S01 Z02 S03 QTY NO PART 4 16 14 S02 Z03 Z04 J 12 Z01 W06 4 26 2 W10 S04...

Страница 7: ...3B 2 L03A 2 L02H 2 L02K 1 QTY NO PART W06 4 J04 2 G 2 H 1 C 2 W02 2 W03 2 W07 2 L08B 2 L06 1 L07 2 L09 2 L15A 2 L19 4 L20 2 L21 2 L04E 2 L22 3 QTY NO PART 90 4 12 8 4 4 86 8 W05 S01 S02 M01 Z02 Z03 Z0...

Страница 8: ...8 QTY NO PART Y6 4 Y7 2 Y10 2 QTY NO PART Y1 2 Y2 2 Y4 2 Y5 1 Y13 1 Y3 1 Y8 1 Y11 2 Y12 2 Y14 8 Y15 2 Y16 2 Y9 4 PC Box No 1 PC Box No 2 x 2PCS PC Box No 1 PC Box No 2 2 Section Assembly...

Страница 9: ...2 J01 1 J02R L 1 1 4 4 Y1 1 Y4 1 Y5 1 Y13 1 8 T08 2 W05 M01 M6 S01 Z02 S03 Y1 Y4 Y13 Y5 Y16 Y15 Y14 Y14 Y14 Y14 A B D E F C C L01A L01A L05A L05A L03F L03E L02C L02D L08A L08A L08B L01C L01B L04C L02...

Страница 10: ...PART J03R L 1 1 J04 2 J01 1 J02R L 1 1 6 6 Y1 1 Y4 1 Y3 1 Y8 1 8 T08 2 W05 M01 M6 S01 Z02 S03 QTY NO PART L02C 1 L02F 2 L02D 1 L02G 2 Y14 4 Y15 1 Y16 1 Y1 Y4 Y8 Y3 Y16 Y15 Y14 Y14 Y2 Y2 Y14 Y14 A B E...

Страница 11: ...C G G H L02H 2 L02K 1 L02F 4 L03B 2 L03A 2 L04E 4 L22 6 Overview of 4 Section Assembly This page shows how one GRANGE 5 is assembled 400x500x302CM When installing a greenhouse longer than 6m the L02H...

Страница 12: ...w of Middle Section Assembly This page shows how one 2 Section is assembled for a longer size QTY NO PART W06 4 QTY NO PART Y6 4 Y7 2 Y9 4 G 2 H 1 C 2 W02 2 W03 2 W07 2 J04 2 86 8 4 4 86 W05 S01 M01 Z...

Страница 13: ...a b a b a b a b 10MM 13 It is crucial the a b dimensions are the same to ensure the base is square Support at corners only is not adequate Expansion Screw Concrete Ground...

Страница 14: ...13086 4 14952 6 16850 1 18769 2 6366 7 9401 2 11150 4 12972 9 14841 7 16741 3 18662 3 7897 3 7775 43 4mm Item No Dimensions Front Assembly Back Assembly 4 Section Assembly W Outer Width of Base Profi...

Страница 15: ...W a b Front Assembly Back Assembly 2 Section Assembly GRANGE 5 2 Section Assembly 6 x 5M GRANGE 5 The basic model GRANGE 5 can be easily extended by adding a 2 Section Assembly each time for a longer...

Страница 16: ...W05 W05 Front 375 750 875 1000 375 750 875 500 1000 1000 1000 1000 1000 500 2 Section Assembly This shows a layout for W05 s positions where it is placed Back in the middle of PC panel for each sectio...

Страница 17: ...3 L18A L18C L18B L16C L05G J J L16C L18C Z01 J L18A L18C Z01 L16C L18B Z01 J L18A L18B Z01 L05G L05G 4 QTY L18A L16A 1 2 NO PART L18B 2 L18C 1 L16B 1 J 12 18 18 24 L16C 1 Y11 2 L18D 1 L18E 2 L18F 1 L...

Страница 18: ...7 11 9 10 12 18 7 8 9 10 12 Y11 8 L18A L18B L16B L16A L05G J J L16A L18B Z01 J L18A L18C Z01 L16A L16B Z01 11 J L18A L16B Z01 L05G Door2 Assembly...

Страница 19: ...7 11 9 10 12 19 7 8 J J L18D L18E Z01 J L18F L18E Z01 L18D L18E Z01 J L18F L18E Z01 L18E 8 Y12 L05H Y12 L17 11 10 12 L18E L18F L18D 9 9 L05H L05H L05H Door3 Assembly...

Страница 20: ...20 L15A L20 L19 L21 Z02 Y10 L19 Z02 Z02 Z02 QTY NO PART L15A 1 L19 2 L20 1 L21 1 W06 2 2 2 4 S02 M01 M6 Z02 Z04 6 Y10 1 Roof Vent Assembly M6x20 4X16D 4X10...

Страница 21: ...J03R L A L08B L08A L08A L08B L08A L08B L08B L08B L08B L08A L08B L08A 1 2 1 2 3 3 4 3 3 4 1 J03R L B L08B L08A J03R L B L08B L08A 2 3 L08B L08B C J04 4 W05 S03 Assemble all W05 followed by previous Pag...

Страница 22: ...22 L01A L03C L03D L01A 1 2 2 3 A L01A B L01A C L03C D 1 2 3...

Страница 23: ...02E L02F L02D L02G L05A L05B L02F L05B 1 2 2 3 4 4 5 7 6 8 8 9 8 8 L05A L02G L01A L01A L02G L05A L02G F L02G F L03C D L02F L03C D L02C L05A L08A L02D L05A L08A L02E L08B L02E L05B L02C D E L02F G L05B...

Страница 24: ...24 L07 L07 L03A L03A 1 2 2 1 3 3 L03A 2 G C L07 L03A D E L07 L01A 1 3 CORRECT WRONG Ensure orientation of the L07 profile is correct as per detail...

Страница 25: ...25 1 L05C L08B L03A L05B L02A L02A L07 L08B 2 3 4 L05B L02A L05C L05C L02A L05B 4 1 3 2 S01x3pcs L02A...

Страница 26: ...2 1 H G 26 L03B 2 2 1 L03B W03...

Страница 27: ...27 L02H L02K W07 L03B L02H L03A W02 1 2 L02H L02K L02H 1 1 2 2...

Страница 28: ...28 L07 L01A L07 L01A 1 1 2 2 3 3 1 A B L01A L07 L01A D E L07 G L03B L03A 2 3 CORRECT WRONG Ensure orientation of the L07 profile is correct as per detail...

Страница 29: ...C L03E F 1 L05C L08B L03A L05B L02A L08B 2 3 L05B 29 L03E L03F 4 4 L05B L02A L05C 1 2 3 4 L05B L02A L05C S01x3pcs L02A...

Страница 30: ...L05A L05A 1 2 2 3 4 4 5 6 7 7 L05A L02G L01A L01A L02G L05A L02G L03E F L02C L05A L08A L02D L05A L08A L02C D L02G 1 2 3 6 5 7 4 L04A L03E F L02D L04A S01x3pcs Slide 3 x S01 into L04A and tighten L04A...

Страница 31: ...31 Y14 Y14 Y14 Y14 Y14 Y14 Y2 Y2 Y14 Y14 L02F 1 1 2 3 L02F L03E F L04C L02F 1 3 W04 2 L04C L04A L04C...

Страница 32: ...5 Y5 Y13 Y1 Y4 Y16 Y15 Y8 Y3 L04D L04D L04D L04D L04E L04E L04D L04D S01x2pcs L04D E Slide 2 x S01 into each L04D E and put each profile onto the edge of each PC panel then tighten all profiles at eac...

Страница 33: ...33 L01C L01B L01B L01C 1 2 3 1 2 3 2 1 3 L01B D F L01B L01C L01C E...

Страница 34: ...34 1 1 2 2 3 3 2 3 2 3 1 2 W01 L01B W01 L01C 3...

Страница 35: ...35 L02B L02B S01x6pcs L02B L02A L02B L06 L06 2 1 2 1 H L06 J05 2 L06...

Страница 36: ...36 L22 L22 L02F L02F L22 L02F L02F L22 1 4 2 L02F L01B C L02F L03B 1 2 4 4 L02B L02F 3...

Страница 37: ...5A L06 The roof vents should be lifted through the vent then lowered into position from above the greenhouse So the holes of the L15A line up with the ridge holes Then the vents can be bolted in place...

Страница 38: ...ert all Y6 panels into each side of greenhouse Insert all Y7 panels into each roof of greenhouse Note If it is difficult sliding any panels in the channels using soapy water or olive oil in the channe...

Страница 39: ...3 2 Use the nut M06 to secure the long screw S05 through the holes of The wingnut M05 must be secured once the vent arm W06 is locked S05 M06 M05 W08 W08A each W08 W08A in place in windy days Note If...

Страница 40: ...9 Y9 Y9 Y9 Y9 L05D L05D Insert all Y9 panels into each roof of greenhouse Note If it is difficult sliding any panels in the channels using soapy water or olive oil in the channels can reduce the frict...

Страница 41: ...with the Z03 screws do not over tighten When installing the J06 and the second section of gutter it can help if you have 2 people one guiding the gutter into the J06 and the other gently tapping the...

Страница 42: ...atch shown in image 3 joins the two sections of the doors together J02R L J02R L J01 1 J01 1 J02R L J02R L 3 2 2 1 J01 T08 J08 Z02 Drill one hole on both L01A approx 500mm up from the bottom Dia 2 5mm...

Страница 43: ...43 W10 Z04 S04 W10 Z04 S04 1 2 2 1 Drill the holes on each L04D as shown Dia 3 2mm and secure the hooks W10 with Z04 S04 L04D L04D then ensure W01 works with Door1 2 3 properly when the doors are open...

Отзывы: