
- 7 -
7
、
Installation
Step 1:
Install meter pillars
a)
Let the communication line pass through the right meter pillar.
b)
Put meter pillars on the base frame. First, use 2 Screw M8*15 and 2 washers; second, use 4 Screw M8*50, 4
washers and 4 nuts to fasten meter pillars. (Don’t tighten screws at first)
Step 2:
Install the meter
a)
Make sure that communication lines are connected correctly
b)
Put the meter on the meter pillars. Use 6 Screw M8*15 and 6 washers to fasten the meter. (Don’t tighten
screws at first)
Screw M8x15
Washer
Screw M8x50
Nut
Screw M8x15
Washer
Communication line
Содержание f28
Страница 6: ...4 4 bersicht bersicht ber alle Einzelteile des Laufbands...
Страница 8: ...6 6 Aufbau des Laufbandes...
Страница 23: ......
Страница 31: ...6 6 Treadmill Structure...
Страница 46: ......
Страница 54: ...6 6 Estructura de la caminadora...
Страница 69: ......
Страница 78: ...7 6 Structure du tapis de course...
Страница 94: ......
Страница 102: ...6 6 Struttura del Tapis Roulant...
Страница 117: ......