Page 10
3. Now install the Tic Tac Toe per instructions page 31.
Level and tighten.
4. Install the double wall slide per instructions page 27.
Make sure water drains out of slide bedway and the
slide guard is level, then tighten.
5. Install the corkscrew climber per instructions on page
33.
Step 5: Concrete
1. Once all components and posts are tight and level, you
may concrete. A good rule of thumb is two 80 lb. bags
of concrete per hole. Do not “dry bag” the concrete,
always mix per instructions on concrete bag. Be sure to
leave concrete about 2” from the top of the ground to
allow backfill.
2. Be sure that all splattered concrete is washed off of the
posts and components while it is still wet.
3. Block off installation area for at least 48 hours.
Step 6: Final after 48 hours
1. Return in 2 days to backfill concrete, drill and install
drive (roll) pins per instructions, and install safety
surfacing.
2. Inspect all components to insure the hardware is tight
and all panels are level.
3. Make sure all tools and dropped hardware are removed
from play area.
4. Open the playground.
Содержание Ray 2
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com 911 110 N Model Ray 2...
Страница 12: ...Page 12 Footing Diagram...
Страница 14: ...Page 14 Side view of installed post...
Страница 22: ...Page 22...
Страница 35: ......
Страница 39: ...Page 39 1 2 3 4...
Страница 40: ...Page 40 5 6 7 8...