SportsPlay Equipment 571-202 Скачать руководство пользователя страница 2

571-202, 203, 204 Ground Socket 

Page 2 of 2 

Rev. 05/16/03 

GENERAL ASSEMBLY INSTRUCTIONS: 

 
Check all parts and hardware against the packing list to insure you have 
received everything needed to assemble this product. 
 
Check each part carefully and remove any sharp edges or projections that may 
have been caused in shipping.  Contact your distributor with notification of 
any missing or damaged parts.  Contact must be made within ten days of 
receipt of your order. 
 
After assembly is complete, all threaded ends of bolts protruding beyond nuts 
should be cut off and/or peened over to remove any sharp projections.  Also, 
there are a few extra washers supplied to be used as spacers where needed to 
prevent any thread projection beyond the nuts. 
 

SPECIFIC ASSEMBLY INSTRUCTIONS: 

 
STEP #1: 

Mark and dig holes. 

 
STEP #2: 

Prop ground sockets in holes and pour concrete.  Allow at least 
48 hours for concrete to harden. 

 
STEP #3: 

If installation is on blacktop, footings should be flush with 

 

 

surface and crowned slightly for drainage. 

 
STEP #4: 

I installed in dirt, footings should be left 3” below surface but 

 

 

crowned for drainage.  After concrete hardens fill in with dirt. 

 

 

This also applies if installation is in sand, wood chips, or 

 

 

other resilient safety surface. 

 

 

 

MAINTENANCE INSTRUCTIONS: 

 
Check periodically for loose bolts or broken parts.  Replace any 
broken or damaged parts immediately.

 

SportsPlay Equipment, Inc. 5642 Natural Bridge, St. Louis MO  63120 

 

Отзывы: