
301-135 NET CLIMBER (Perm)
Page
3
Rev 11/17/09
301-135.I.CC.1109.2
Sportsplay Equipment, Inc
., 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140
GENERAL ASSEMBLY INSTRUCTIONS:
Check all the parts and hardware with the packing list to be sure you have received everything
needed to assemble this product. CONTACT YOUR LOCAL DISTRIBUTOR WITH NOTIFICATION OF ANY MISSING
OR DAMAGED PARTS. Contact must be made within ten days of receipt of your order.
Only hand-tighten nuts & bolts on initial assembly. Final tightening should be done EVENLY after
final assembly when unit has bee plumbed and leveled. T-Clamps are designed for both one and two
bolt connections. In many situations only one bolt is required. We have not pre-drilled holes
for the second bolts since slight variations in the installation process can cause “lining up”
problems. Extra hardware is supplied for those customers who wish to drill through the second bolt
hole of the clamps following initial assembly to reinforce the connections.
GENERAL MAINTENANCE INSTRUCTIONS:
Check MONTHLY for loose bolts, damaged or broken parts. Tighten and/or replace immediately.
SPECIFIC ASSEMBLY INSTRUCTIONS:
Note:
All threaded ends of bolts protruding beyond nuts must be cut off and/or peened to
eliminate sharp edges. No more than two threads should extend beyond face of nut.
All washers, “T” nuts, and other fastener hardware used on round pipe or tubing must
be hammered down to conform to the curved underlying surface to eliminate catch
points.
STEP #1:
Drive Pipe Plugs (105-015) into ends of (303-305) Top Ladder Assy., bottom legs of
(303-307) Ladder Assy., and (303-328). Ladder Assy., and bottom of (303-210) and
(303-144) Uprights. SEE ILLUSTRATION #1. File off any metal shavings.
STEP #2:
Assemble “upside-down”. With top ladder on ground attach ladder assemblies &
uprights. SEE ILLUSTRATION #2.
STEP #3:
Attach (303-281) End Braces, (303-206) Center Cross Bar, & (303-207) Bottom Net Rail.
SEE ILLUSTRATION #3 AND #5.
STEP #4:
Turn assembly over. Attach net on inside of top ladder and bottom net rail. SEE
ILLUSTRATION #4. Bottom Net Rail (303-207) should be loosened for easy assembly.
After net is attached stand on bottom net rail to stretch net tight, then tighten end
clamps to hold position.
STEP #5:
Mark & dig footing holes. Brace unit in holes to proper depth. Length of pipe below
playing surface should be 24” with depth of pipe in concrete varying depending on
depth of resilient surfacing to be used. Plumb & level. Tighten all nuts & bolts so
that lock washers are flat. Pour concrete. Wait 48 hours before removing braces &
using equipment.
STEP #6:
Attach Warning Label and Manufacturer’s Identification Label to a clean surface. The
Labels should be attached in a location where they are clearly visible and legible
and away from normal hand and foot placement areas. The Labels must be replaced if
they become illegible, destroyed, or removed. Contact your Distributor for
replacement Labels.