-8-
1-1. Use connector tubes (25,26) to connect the main frame (5) to the secondary frame
(27). Then use connectors (66 and 64) and hardware (61,62,63,65,67) to loosely
secure these pieces. Do not tighten screws yet.
1-2. Set the unit flat on the floor. First secure hardware (61,62,63,65) on the main frame
(5). Then secure hardware (62,63,65,67) on the secondary frame (27).
Содержание DF-108
Страница 3: ...2 2 1 DIMENSIONS CHAPTER 2 INSTRUCTIONS...
Страница 8: ...7 STEP 1 CHAPTER 3 ASSEMBLY INSTRUCTIONS Connector Installation...
Страница 10: ...STEP 2 9 Weight Plate Installation...
Страница 12: ...11 2 2 Remove hardware 69 70 71 Guide the guide rods 72 downward as shown...
Страница 16: ...15 2 7 Tilt the guide rods 72 back into place...
Страница 17: ...16 2 8 Lift the guide rods 72 up into their mounting station Then secure them with hardware 69 70 71...
Страница 18: ...17 STEP 3 Application Weight Stack Sticker...
Страница 21: ...20 Seat Frame Installation STEP 5...
Страница 27: ...26 Cable Installation STEP 9...
Страница 33: ...12 3 Hang back cover A 1 onto screws 89 Simultaneously hook back cover A 1 into back cover 2 32...
Страница 34: ...Front Top Cover Installation STEP 13 13 1 Use screws 43 to secure the front top cover onto the stack tower 33...
Страница 40: ...To adjust the press handle pull the adjustment knob outward and move the handle to the desired position 39...