background image

Operating/assembly instructions 

Volleyball posts

 

Prod. code: 115 8029 

Sport-Thieme GmbH

 

38367 Grasleben / Germany 
Tel:  +49 (0)5357 181 81

 

Fax: +49 (0)5357 181 90

 

page 1  of 3 

04/2016 

 

 

 

Operating/assembly instructions for volleyball posts

 

 

Thank you very much for choosing a 

Sport-Thieme

 product. We want to make sure 

that you can enjoy this product, so here is some important advice for your safety as 

well as for the use and maintenance of the equipment. 

Please read these instructions carefully before you assemble and  

use the equipment: 

 
 
 

 

cover  
for tensioning 
mechanism 

 
 

 

upper volleyball posts 

 

cover for tensioning 
mechanism 

 
 
 
 

 

height locking with 
grub screw  

 
 
 

 

base posts 

 
 
 
 
 

 

Illustration 1: volleyball post

 

 

1. Operating and assembly instructions

 

 

The  base  posts  are  set  into  measured  foundations.  Measure  the  foundation  in 
compliance with the loads and measures as shown in illustration 2. Stable ground is 
required for laying the foundations. 
The insertion depth into the ground sockets is 35 cm. The foundations for the sockets 
should be approx. 80x80x80 cm in undisturbed ground, or approx. 100x100x100 cm 
in backfilled, light ground. 

 

Note:

 

The volleyball posts can also be used for ground sockets (prod. code: 151 5608-2). 
Once the base posts are standing securely, push the upper volleyball posts onto the 
base posts. You can now lock the posts at the desired height using the grub screws. 
When the desired height is set, you can attach the net to the existing eyelets. 

Отзывы: