XBR25 / XBR55
16
STEP 2: CONSOLE MAST ASSEMBLY
1. Install the Console Mast Cover (31) onto the console mast (2). Make sure the plastic cover is in the
correct orientation.
2. Feed the computer cable (44), Hand pulse Wire Harness (133) and Switch Cable (148) though the
bottom of the console mast (2) and out though the opening at the top.
3. Install the console mast (2) into the receiving tube (make sure not to pinch the wire cable as
damage to the electronics could occur) of the Main Frame with the six 5/16 Hex Head bolts (68),
four 5/16 Flat Washers (76) on the sides of the tube and two 5/16 Curved Washers (83) on the
front of the tube by using the 12/14mm Wrench (112).
4. Remove the white Styrofoam pad (factory installed to prevent bolts from being accidentally
dropped into the Bike).
5. Install the Handlebar (3) onto the Console Mast (2) with the two 5/16 x 15mm Hex Head Bolts (68),
two 5/16 x 19 Flat Washers (76) and two 8m/m Split Washers (82) by using the 12/14mm Wrench
(112).
6. Install the Upper Computer Cable (44), Hand pulse Wire Harness (133) and Switch Cable
(148) into the connector in the back of the Console (19). Install the console onto the mounting
plate with the four M5x12mm Phillips Head Screws (99).