![Spirax Sarco M33 ISO Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/spirax-sarco/m33-iso-series/m33-iso-series_installation-and-maintenance-instructions-manual_1347939002.webp)
IM-P133-65
CMGT Issue 2
2
Safe operation of these products can only be guaranteed if they are properly installed, commissioned,
used and maintained by qualified personnel (see Section 1.11) in compliance with the operating
instructions. General installation and safety instructions for pipeline and plant construction, as
well as the proper use of tools and safety equipment must also be complied with.
1.1 Intended use
Referring to the Installation and Maintenance Instructions, name-plate and Technical Information
Sheet, check that the product is suitable for the intended use/application.
The products listed below comply with the requirements of the Pressure Equipment Directive
(PED) and carry the
mark when so required. The products fall within the following Pressure
Equipment Directive categories:
Product
Size
Group 1
Gases
Group 2
Gases
Group 1
Liquids
Group 2
Liquids
M33F ISO,
M33S ISO
and
M33V ISO
DN50
2
1
2
SEP
DN65
2
1
2
SEP
DN80
2
1
2
SEP
DN100
2
1
2
SEP
DN150
2
2
2
SEP
DN200
2
2
2
SEP
i) The product has been specifically designed for use on steam, compressed air, water and other
industrial fluids that are in Group 2 of the above mentioned Pressure Equipment Directive.
ii) Check material suitability, pressure and temperature and their maximum and minimum values.
If the maximum operating limits of the product are lower than those of the system in which it
is being fitted, or if malfunction of the product could result in a dangerous overpressure or
overtemperature occurrence, ensure a safety device is included in the system to prevent such
over-limit situations.
iii) Determine the correct installation situation and direction of fluid flow.
iv) Spirax Sarco products are not intended to withstand external stresses that may be induced by
any system to which they are fitted. It is the responsibility of the installer to consider these
stresses and take adequate precautions to minimise them.
v) Remove protection covers from all connections and protective film from all name-plates, where
appropriate, before installation on steam or other high temperature applications.
1.2 Access
Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting
to work on the product. Arrange suitable lifting gear if required.
1.3 Lighting
Ensure adequate lighting, particularly where detailed or intricate work is required.
1. Safety information
Содержание M33 ISO Series
Страница 15: ...IM P133 65 CMGT Issue 2 15...
Страница 16: ...IM P133 65 CMGT Issue 2 16...