Spirax Sarco FTC23 Скачать руководство пользователя страница 11

3.341.5275.241

7

2.5 Capacities

Capacities

 (kg/h) 

The condensate discharge capacities shown below are based on the actual temperature of operation.

Differential pressure (bar g)

FTC23-7

FTC23-23

0,3

310

n.a.

0,5

490

330

0,7

590

500

1

1.000

700

1,5

1.400

830

2

1.820

1.080

4

2.510

1.550

7

3.000

2.050

10

2.340

13

2.540

15

2.680

18

2.880

21

3.070

23

3.160

The choice of trap should be based on the following data:

a) Hourly amount of condensate to be discharged, 

b) Effective differential pressure

Safety factor: 1,25 ÷ 1,5 with continuous duty; 2 ÷ 3 with intermittent duty.

3. Installation

Note: Before actioning any installation observe the ‘Safety information’ in Section 1.

Referring to the Installation and Maintenance Instructions, name-plate and Technical Information 

Sheet, check that the product is suitable for the intended installation.

3.1

  Check materials, pressure and temperature and their maximum values. If the maximum 

operating limit of the product is lower than that of the system in which it is being fitted, ensure 

that a safety device is included in the system to prevent overpressurisation.

3.2

 

Determine the correct installation situation and the direction of fluid flow.

3.3

 

Remove protection covers from all connections before installation.

3.4

 

The FTC23 trap must be installed below the draining point and respecting the flow direction 

as shown on the body and with the float lever positioned on an horizontal plane so that it 

can verticallyu rise and lower freely.

3.5

 

Insert a strainer with an adequate capacity immediately ahead of the trap to prevent damage 

to the device’s internal components; in systems with steam recovery, it is recommended to 

mount a flow indicator downstream of the trap to check that it is working.

3.6

  In order to allow a safe inspection for cleaning or maintenance purpose, install suitable 

shut-off valve.

Содержание FTC23

Страница 1: ...Installation and Maintenance Instructions 1 Safety information 2 General product information 3 Installation 4 Commissioning 5 Operation 6 Maintenance 7 Spare parts The PED Directive 97 23 EC is repeal...

Страница 2: ...urezza La ghisa un materiale fragile in caso di caduta accidentale il prodotto in ghisa non pi utilizzabile Per informazioni pi dettagliate consultare il manuale d istruzioni del prodotto Rimuovere la...

Страница 3: ...d ariete Prevention of water hammer Scarico condensa nelle linee vapore Steam trapping on steam mains Intervalli di 30 50 m intervals Pendenza Gradient 1 100 Vapore Steam Gruppo di scarico Trap set Co...

Страница 4: ...ducts or re assembling after maintenance Evitare l eccessivo serraggio Utilizzare le coppie di serraggio raccomandate Do not over tighten Use correct torque figures Per garantire l uniformit del caric...

Страница 5: ...rom the bellows manufacturer Guide Guides Distanza breve Short distance Punto di fissaggio Fixing point Movimento assiale Axial movement Distanza media Medium distance Tiranti limitatori Limit rods Pi...

Страница 6: ...cation II Check material suitability pressure and temperature and their maximum and minimum values If the maximum operating limits of the product are lower than those of the system in which it is bein...

Страница 7: ...nd ope rating personnel should be trained in the correct use of the product according to the Installation and Maintenance Instructions Where a formal permit to work system is in force it must be compl...

Страница 8: ...current legislation 1 17 Returning products Customers and stockists are reminded that under EC Health Safety and Environment Law when returning products to Spirax Sarco they must provide information...

Страница 9: ...densate in the device In this way it is allowed both the removal of any sediment interior and checking the proper operation of the unit Standards This product fully complies with the requirements of t...

Страница 10: ...el AISI 304 7 Ball Stainless steel AISI 316 8 Float lever Stainless steel ASTM A240 316 9 Float lever pin Stainless steel ASTM A479 316 10 Float Stainless steel AISI 316 11 Washer Stainless steel AISI...

Страница 11: ...tallation 3 1 Check materials pressure and temperature and their maximum values If the maximum operating limit of the product is lower than that of the system in which it is being fitted ensure that a...

Страница 12: ...ear to the trap cover Note If the trap is to discharge to atmosphere ensure it is to a safe place the discharging fluid may be at a temperature of 100 C 212 F 4 Commissioning After installation or mai...

Страница 13: ...works properly and that the ball plug moves freely to a completely closed position To replace the main valve assembly unscrew the four nuts from the bolts When mounting the new set check its integrit...

Страница 14: ...Check the proper operation of the lever 19 turning it 90 anticlockwise 6 6 How to fit Float Lever and Pin Assembly Unscrew the 8 cover nuts 21 remove the cover 13 keeping the lever 19 in vertical posi...

Страница 15: ...en tighten nut and locknut 20 Fit the new gasket 3 Fit the cover 13 with the lever 19 in in vertical position downwards Tighten the nuts 21 to the recommended tightening torques Tab 1 Check the proper...

Страница 16: ...ets set 3 3 units 3 4 1 3 5 9 10 13 14 21 15 16 17 18 19 20 2 11 12 8 7 6 4 14 How to order spares Always order spare parts by using the description given in the table and state the size and type of t...

Отзывы: