Spirax Sarco Flowin 2 Скачать руководство пользователя страница 1

IM-P330-74 

 MI Issue 1

1

 © Copyright 2009

Printed in the UK

Flowin 2 

Natural Gas Flowmeter

Essential Installation Guide

IM-P330-74

MI Issue 1

3309851/1

This document must be read in conjunction with IM-P330-73.

Warning

To avoid the risk of injury to personnel or damage to plant or equipment, the safety 

information  and  technical  data  in  the  Installation  and  Maintenance  Instructions 

(IM-P330-73) should be read and assessed before attempting any installation work.

Caution

To avoid the risk of damage or loss of accuracy, the installation and commissioning 
guidelines in the IM-P330-73 should be read and understood.

Essential installation guidelines

The flowmeter may be installed in a horizontal or vertical pipeline, with flow in any direction. 

The preferred orientation for a Flowin 2 natural gas flowmeter is in a horizontal pipeline, with 

the flowmeter display facing either upwards or downwards as illustrated in Figure 1.

Before powering up the Flowin 2 for the first time, complete the following checklist:
1. 

Are all required connections made?

  (a)  Loop?
  (b)  Pulse? (if required)
  (c)  Grounding to earth of RF braiding at the Flowin end (only) of the loop and pulse cables?
  (d)  Flange earth connections?

2. 

Are all the connections secure?

3. 

Is the polarity of all connections correct?

4. 

Check that the earth resistance is in accordance with the technical data in IM-P330-73.

5. 

Ensure there is no possibility of a short circuit occurring when the PCB housing is refitted.

6. 

Refit the PCB housing to the flowmeter body in the orientation desired before ‘powering 

  up’ the flowmeter.

Fig. 1

Caution:  

Maximum permissible flange bolt tightening torque is 160 N m

Filter 250 micron

Downstream distance

Check valve

3'D'

Location of 

flowmeter data label

Upstream distance

6'D'

D = Nominal bore of the pipe

Location of cast flow 

arrow

Отзывы: