ATTENTION
Sliding loads are sensitive to impact. Do not drop!
Keep dry and avoid exposure to sudden temperature changes to prevent condensation.
Environmental conditions for storage are specified in the data sheets “
741650-BE”
or
"741651-BE".
Loose lateral locking screw (3) at the end of the sliding load.
Push inner conductor (7) carefully further into the sliding load until it sticks out at the connector.
Align sliding load (2) and protection cap (1) carefully. The plug inner conductor has to intrude
concentrically into the bushing of the socket connector.
Push sliding load inner conductor (7) very carefully into protection cap inner conductor until
stop. Hold on the protection cap body (4) and tighten the coupling nut (5) hand-tight until the
mating plane surfaces have contact. Do not turn the protection cap body (4) or sliding load body
(6). Only turn the coupling nut (5).
Do not overstrain the connection.
Tighten lateral locking screw (3) at the end of the sliding load hand-tight.
Store the sliding load in a box when not in use.
Never store the sliding load without the protection cap. This is the most common cause of
damages during storage.
Avoid touching mating plane surfaces with your fingers. Residues on the connector interface
may degrade the performance of the sliding load and can only be removed with difficulty.
Always make sure that the connectors are in a clean condition.
Avoid the contact of the sliding load interface surfaces with any hard material. The plating and
the mating plane surfaces may be damaged if the interface contacts any hard surface
uncontrolled.
After any shock to the sliding load (e.g. drop down on the floor) recalibration is recommended.
9.
Recalibration
The suggested initial interval for recalibration is 12 months or 500 matings, whichever comes first.
The actual need for recalibration depends on the use and the maintenance of the sliding load. The
recalibration interval should begin with the day of initial use after recalibration.
The SPINNER recalibration service includes
cleaning of the connector interfaces
electrical testing